Process Equipment and Plant Design Accidents in chemical plants are mostly due to Improper layout of the equipments Faulty operating procedures Failure of equipments Inadequate equipment design Improper layout of the equipments Faulty operating procedures Failure of equipments Inadequate equipment design ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a shell and tube heat exchanger, the clearance of the tube is generally Not less than one-fourth of the tube diameter or 3/16" More in case of triangular pitch as compared to the square pitch tube layout Equal to the tube diameter More than the tube diameter Not less than one-fourth of the tube diameter or 3/16" More in case of triangular pitch as compared to the square pitch tube layout Equal to the tube diameter More than the tube diameter ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Tube height in a calendria type evaporator is normally less than __________ metres. 5.5 3.5 2 1 5.5 3.5 2 1 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The testing pressure of storage tanks and pressure vessels designed as per Indian standard codes should be about __________ times.the design pressure. 1.5 to 2 4 to 5 >5 3 to 4 1.5 to 2 4 to 5 >5 3 to 4 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Smaller sized packings are generally dumped to the packed columns, and the large ones of size greater than __________ mm are stacked individually, which provides better control over bed porosity and offers lower gas pressure drop. 150 50 25 75 150 50 25 75 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The operating velocity in the absorption tower is usually 40-50% of the flooding velocity. Packed absorption towers are normally designed for a pressure drop of about __________ mm of water column per metre height of packing. 1000-1500 20-40 43835 100-150 1000-1500 20-40 43835 100-150 ANSWER DOWNLOAD EXAMIANS APP