MGVCL Exam Paper (30-07-2021 Shift 2)
A 1000 kVA ONAN cooled transformer has a load of 500 kVA throughout the day except for a period of 4 hours. What is the permissible overload for a duration of four hours. Assume the permissible load kVA as a fraction of rated kVA is 1.24.

2480 kVA
1240 kVA
620 kVA
930 kVA

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
In the context of smart meters, the term 'SMETS' stand for

Smart Monitoring Equipment Technical Specifications
Standard Metering Equipment Technical Specifications
Smart Metering Equipment Technical Specifications
Standard Monitoring Equipment Technical Specifications

ANSWER DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
In the circuit of figure, the switch is closed to position-1 for a long time. At t = 0 the switch position is changed from postion-1 to postion-2. Find an expression for the current i(t).

i(t) = (E/R) sin[1/√(LC)]t A
i(t) = (E/R) cos√(LC) t A
i(t) = (E/R) cos[1/√(LC)]t A
i(t) = (E/R) sin√(LC) t A

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
In a power network, 400 kV is recorded at a 415 kV bus. A 50 MVAR, 415 kV shunt reactor is connected to the bus. What is the reactive power absorbed by the shunt reactor?

56.45 MVAR
46.45 MVAR
66.45 MVAR
76.45 MVAR

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
A three-phase, 12 kV, 50 Hz and 300 kW load is operating at 0.8 pf lag. If the pf is to be improved to unity, using star connected capacitor, the per phase value of the reactive VAR required is:

100 kVAR
75 kVAR
25 kVAR
50 kVAR

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP