MGVCL Exam Paper (30-07-2021 Shift 2)
A 1000 kVA ONAN cooled transformer has a load of 500 kVA throughout the day except for a period of 4 hours. What is the permissible overload for a duration of four hours. Assume the permissible load kVA as a fraction of rated kVA is 1.24.

930 kVA
2480 kVA
620 kVA
1240 kVA

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
Which one of the following statement with respect to Aerial Bunched Cables (ABC) system is TRUE?

The overall cost of the ABC system is very high as compared to the bare conductor system.
ABC system requires more clearance, insulators and high maintenance.
ABC system is not suitable for rural electrification which are situated in difficult terrain, hills, forests and coastal areas.
ABC system totally eliminates the fault on lines and thereby improving the quality of supply.

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
A three-phase 400 V, 6-pole, 50 Hz squirrel-cage induction motor is running at a slip of 5%. The speed of rotor with respect to stator magnetic field and speed of the stator magnetic field with respect to rotor magnetic field are

-50 rpm, 1000 rpm
950 rpm, 1000 rpm
950 rpm, zero
-50 rpm, zero

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP