GETCO Exam Paper (22-07-2015) Who is the Energy and Petrochemicals minister of Gujarat? (As on 22/07/2015) Saurabh Patel Nitin Patel Anandiben Patel Bhupendrasinh Chudasama Saurabh Patel Nitin Patel Anandiben Patel Bhupendrasinh Chudasama ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Power Factor correcting element is generally connected in _____ parallel to the load series with load series with source parallel to source parallel to the load series with load series with source parallel to source ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Calculate torque developed by the 3-phase, 5 HP, 4 pole induction motor runs at 1500 rpm 10 N-m 22 N-m 0 N-m 23.5 N-m 10 N-m 22 N-m 0 N-m 23.5 N-m ANSWER EXPLANATION DOWNLOAD EXAMIANS APP P = 2πTN/60 where N is speed in rpm
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Short circuit limit Transient stability limit Steady state limit Reactive power limit Short circuit limit Transient stability limit Steady state limit Reactive power limit ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) What is the surge impedance loading of 400 kV line with surge impedance given as 160 Ω 1000 MW 1000 kW 400 MW 250 MW 1000 MW 1000 kW 400 MW 250 MW ANSWER EXPLANATION DOWNLOAD EXAMIANS APP SIL = (kV)²/Z₀
GETCO Exam Paper (22-07-2015) Which of the following is the most likely reason for large overshoot in a control system? High gain in a system high positive correcting torque high retarding torque presence of dead time delay High gain in a system high positive correcting torque high retarding torque presence of dead time delay ANSWER DOWNLOAD EXAMIANS APP