• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

GETCO Exam Paper (22-07-2015)

GETCO Exam Paper (22-07-2015)
Power Factor correcting element is generally connected in _____

parallel to source
parallel to the load
series with load
series with source

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
What is the surge impedance loading of 400 kV line with surge impedance given as 160 Ω

1000 MW
1000 kW
250 MW
400 MW

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

SIL = (kV)²/Z₀

GETCO Exam Paper (22-07-2015)
When the load is suddenly increased in the receiving end of the system, the phase shift will

Not affected
decrease
increase
remains same

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Fuel cell for power generation have drawback of _____

Synchronization problems
Very high development costs
Low life span
Noise, pollution and maintenance problems

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
For formation of the Y bus matrix (using node voltage analysis) in power system network modelling _____ is used

Faraday's law
all are correct
KCL
KVL

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
The value of holding ratio of relay is always

zero
greater than 1
Infinite
less than 1

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (22-07-2015)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑