GETCO Exam Paper (22-07-2015) Power Factor correcting element is generally connected in _____ parallel to source parallel to the load series with load series with source parallel to source parallel to the load series with load series with source ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) What is the surge impedance loading of 400 kV line with surge impedance given as 160 Ω 1000 MW 1000 kW 250 MW 400 MW 1000 MW 1000 kW 250 MW 400 MW ANSWER EXPLANATION DOWNLOAD EXAMIANS APP SIL = (kV)²/Z₀
GETCO Exam Paper (22-07-2015) When the load is suddenly increased in the receiving end of the system, the phase shift will Not affected decrease increase remains same Not affected decrease increase remains same ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Fuel cell for power generation have drawback of _____ Synchronization problems Very high development costs Low life span Noise, pollution and maintenance problems Synchronization problems Very high development costs Low life span Noise, pollution and maintenance problems ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) For formation of the Y bus matrix (using node voltage analysis) in power system network modelling _____ is used Faraday's law all are correct KCL KVL Faraday's law all are correct KCL KVL ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The value of holding ratio of relay is always zero greater than 1 Infinite less than 1 zero greater than 1 Infinite less than 1 ANSWER DOWNLOAD EXAMIANS APP