GETCO Exam Paper (22-07-2015) Penalty factor in power system economical operation is measure of Line loss fuel cost all are correct generation cost Line loss fuel cost all are correct generation cost ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In a power system network, at which bus the shunt is connected that can be known from none of these type of bus Y bus of the system reactive power demand none of these type of bus Y bus of the system reactive power demand ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Power Factor correcting element is generally connected in _____ series with load parallel to the load parallel to source series with source series with load parallel to the load parallel to source series with source ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Light from the nearest star (other than the sun) reaches the earth in 42 secs 4.2 years 4.2 minutes 4.2 hours 42 secs 4.2 years 4.2 minutes 4.2 hours ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Differential equation is required to be solved in _____ economical operation of power systems Finding efficiency of a transmission line Stability studies Load flow studies economical operation of power systems Finding efficiency of a transmission line Stability studies Load flow studies ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Who is the Energy and Petrochemicals minister of Gujarat? (As on 22/07/2015) Nitin Patel Anandiben Patel Saurabh Patel Bhupendrasinh Chudasama Nitin Patel Anandiben Patel Saurabh Patel Bhupendrasinh Chudasama ANSWER DOWNLOAD EXAMIANS APP