GETCO Exam Paper (22-07-2015) Penalty factor in power system economical operation is measure of generation cost all are correct Line loss fuel cost generation cost all are correct Line loss fuel cost ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In comparison to steam plant, the annual fixed cost of nuclear plant is almost equal Can't say Quit low Quit high almost equal Can't say Quit low Quit high ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The rating of given on the name plate of a transformer indicates the: Apparent power which it draws from the supply mains True power which it can supply True power whichh it draws from the supply mains Apparent power which it can supply Apparent power which it draws from the supply mains True power which it can supply True power whichh it draws from the supply mains Apparent power which it can supply ANSWER EXPLANATION DOWNLOAD EXAMIANS APP The rating of given on the name plate of a transformer indicates the:Apparent power which it can supply S=V( supplied voltage)*I (load current)active power = v* i*cosφreactive power = v* i*sinφ
GETCO Exam Paper (22-07-2015) Merz-Price protection is employed for protection of alternators circuit breaker transmission lines motor alternators circuit breaker transmission lines motor ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following award was not awarded to late Dr. Abdul Kalam? Padma Bhusan Padma Vibhushan Veer Chakra Bharat Ratna Padma Bhusan Padma Vibhushan Veer Chakra Bharat Ratna ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The area under the load duration curve represents base load of the system energy generated in the period considered Maximum demand of the power station average load of the system base load of the system energy generated in the period considered Maximum demand of the power station average load of the system ANSWER DOWNLOAD EXAMIANS APP