GETCO Exam Paper (22-07-2015) The constraints that are to be met with while solving UC problem are Minimum down time Minimum up time all are correct Spinning reserve Minimum down time Minimum up time all are correct Spinning reserve ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The line current in a three phase unbalanced load are Ir= 4+j6, Ib= 2-j2 and Ic= -3+j2, then zero sequence component of current will be 9 + j10 1 + j2 3 - j6 3 + j6 9 + j10 1 + j2 3 - j6 3 + j6 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The PU impedance of a 1089 MVA, 33 kV generator is 1, the ohmic value of its impedance is: 0.5 10 1 100 0.5 10 1 100 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Switching surges are high voltage Acs high votage DCs short duration transient voltage power frequency voltage high voltage Acs high votage DCs short duration transient voltage power frequency voltage ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Steady state stability of a power system is improved by decreasing generator inertia by fast switching reducing fault clearing time using double circuit line instead of single circuit line decreasing generator inertia by fast switching reducing fault clearing time using double circuit line instead of single circuit line ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Differential equation is required to be solved in _____ Finding efficiency of a transmission line Load flow studies Stability studies economical operation of power systems Finding efficiency of a transmission line Load flow studies Stability studies economical operation of power systems ANSWER DOWNLOAD EXAMIANS APP