GETCO Exam Paper (22-07-2015)

GETCO Exam Paper (22-07-2015)
The constraints that are to be met with while solving UC problem are

Minimum down time
Minimum up time
all are correct
Spinning reserve

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
The line current in a three phase unbalanced load are Ir= 4+j6, Ib= 2-j2 and Ic= -3+j2, then zero sequence component of current will be

9 + j10
1 + j2
3 - j6
3 + j6

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
The PU impedance of a 1089 MVA, 33 kV generator is 1, the ohmic value of its impedance is:

0.5
10
1
100

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Switching surges are

high voltage Acs
high votage DCs
short duration transient voltage
power frequency voltage

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Steady state stability of a power system is improved by

decreasing generator inertia
by fast switching
reducing fault clearing time
using double circuit line instead of single circuit line

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Differential equation is required to be solved in _____

Finding efficiency of a transmission line
Load flow studies
Stability studies
economical operation of power systems

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (22-07-2015)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑