GETCO Exam Paper (22-07-2015) The constraints that are to be met with while solving UC problem are all are correct Minimum down time Spinning reserve Minimum up time all are correct Minimum down time Spinning reserve Minimum up time ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Select the wrong statement from the following in relation to power flow analysis jacobian is always required Approximation is used in FDLF method No of ittretion in N R method can not be more than 30 for any system Y Bus is required for power flow analysis jacobian is always required Approximation is used in FDLF method No of ittretion in N R method can not be more than 30 for any system Y Bus is required for power flow analysis ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) To find the most accurate values of resistance and inductance of the transmission line T configuration is used Distributed parameter configuration used Pi configuration is used End condenser configuration is used T configuration is used Distributed parameter configuration used Pi configuration is used End condenser configuration is used ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Two heaters rated at 500 W, 250 V each are conneted in series across a 250 V, 50 Hz mains. The total power drawn from the supply would be _____ watt. 500 1000 125 250 500 1000 125 250 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) "Overshoot" in a time response of control systems is indication of none of this final value of the output measure of relative stability steady state solution none of this final value of the output measure of relative stability steady state solution ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) For formation of the Y bus matrix (using node voltage analysis) in power system network modelling _____ is used KCL KVL Faraday's law all are correct KCL KVL Faraday's law all are correct ANSWER DOWNLOAD EXAMIANS APP