GETCO Exam Paper (22-07-2015) What is the surge impedance loading of 400 kV line with surge impedance given as 160 Ω 1000 kW 1000 MW 400 MW 250 MW 1000 kW 1000 MW 400 MW 250 MW ANSWER EXPLANATION DOWNLOAD EXAMIANS APP SIL = (kV)²/Z₀
GETCO Exam Paper (22-07-2015) Who is the vice president of India? (As on 22/07/2015) Pranav Mukharjee Nazama heptulla O.P. Kohli Dr. Hamid Ansari Pranav Mukharjee Nazama heptulla O.P. Kohli Dr. Hamid Ansari ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? angle of the voltage is not considered Change in voltage magnitude marginally affects real power AVR loop response is slower than LFC loop deference of error is the main reason angle of the voltage is not considered Change in voltage magnitude marginally affects real power AVR loop response is slower than LFC loop deference of error is the main reason ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Transient stability limit Short circuit limit Reactive power limit Steady state limit Transient stability limit Short circuit limit Reactive power limit Steady state limit ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The breaking capacity of a CB is usually expressed interms of MVA amperes MW volts MVA amperes MW volts ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following breaking method save energy? plugging dynamic breaking regenerative breaking resistor breaking plugging dynamic breaking regenerative breaking resistor breaking ANSWER EXPLANATION DOWNLOAD EXAMIANS APP three types of electric breaking:Regenerative breaking( leads to economic and energy consevation)pugging (more efficient method of breaking)rheostatic breaking