The fault occurring in transmission actually are mostly

L-L-L
L-G
L-L
L-L-G

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Two watt meter method for 3 phase circuit is preferred over other methods because

all are correct
PF of the load can also be estimated
it can be used for star or delta connected load
it can be used for balanced or unbalanced load

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Shunt capacitors in a substation

delivers lagging VAR
consumes lagging VAR
deliver active power
consume active power

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
In comparison to steam plant, the annual fixed cost of nuclear plant is

Can't say
Quit low
Quit high
almost equal

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
When the load is suddenly increased in the receiving end of the system, the phase shift will

remains same
increase
decrease
Not affected

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Who was the political Guru of Netaji?

R. Das
Sardar Patel
Gokhle
Lokmanya Tilak

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (22-07-2015)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑