GETCO Exam Paper (22-07-2015) The fault occurring in transmission actually are mostly L-L-G L-L-L L-G L-L L-L-G L-L-L L-G L-L ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? none of these Base load solar power plant Peak load none of these Base load solar power plant Peak load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The line current in a three phase unbalanced load are Ir= 4+j6, Ib= 2-j2 and Ic= -3+j2, then zero sequence component of current will be 9 + j10 3 + j6 3 - j6 1 + j2 9 + j10 3 + j6 3 - j6 1 + j2 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is the most likely reason for large overshoot in a control system? High gain in a system high positive correcting torque high retarding torque presence of dead time delay High gain in a system high positive correcting torque high retarding torque presence of dead time delay ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Babies _____ when they are hungry is crying cry are crying cries is crying cry are crying cries ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In load flow analysis, the load at the bus is represented as a voltag dependent impedance at the bus a constant current drawn from the bus none of these a constant impedance connected at the bus a voltag dependent impedance at the bus a constant current drawn from the bus none of these a constant impedance connected at the bus ANSWER DOWNLOAD EXAMIANS APP