GETCO Exam Paper (22-07-2015) The fault occurring in transmission actually are mostly L-L L-G L-L-G L-L-L L-L L-G L-L-G L-L-L ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In G-S method of power flow problem, the number of iterations _____ depends on voltage control buses depends on tolerance remains fixed depends on no of buses depends on voltage control buses depends on tolerance remains fixed depends on no of buses ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is the wrong statement in terms of slack bus? it should be located at the centre of the area it should be the largest generator bus in the system voltage and angle is specified at this bus it has finite reactive power generation capability it should be located at the centre of the area it should be the largest generator bus in the system voltage and angle is specified at this bus it has finite reactive power generation capability ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) When the load is suddenly increased in the receiving end of the system, the phase shift will increase Not affected remains same decrease increase Not affected remains same decrease ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) For selecting low voltage cable which of the following factors is not important? permissible voltage drop current carrying capacity voltage grade short circuit current rating permissible voltage drop current carrying capacity voltage grade short circuit current rating ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is the most likely reason for large overshoot in a control system? presence of dead time delay high positive correcting torque high retarding torque High gain in a system presence of dead time delay high positive correcting torque high retarding torque High gain in a system ANSWER DOWNLOAD EXAMIANS APP