GETCO Exam Paper (22-07-2015)

GETCO Exam Paper (22-07-2015)
The fault occurring in transmission actually are mostly

L-L-G
L-L-L
L-G
L-L

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Which power plant may take several days to start up and shunt down?

none of these
Base load
solar power plant
Peak load

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
The line current in a three phase unbalanced load are Ir= 4+j6, Ib= 2-j2 and Ic= -3+j2, then zero sequence component of current will be

9 + j10
3 + j6
3 - j6
1 + j2

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Which of the following is the most likely reason for large overshoot in a control system?

High gain in a system
high positive correcting torque
high retarding torque
presence of dead time delay

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Babies _____ when they are hungry

is crying
cry
are crying
cries

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
In load flow analysis, the load at the bus is represented as

a voltag dependent impedance at the bus
a constant current drawn from the bus
none of these
a constant impedance connected at the bus

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (22-07-2015)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑