• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

GETCO Exam Paper (22-07-2015)

GETCO Exam Paper (22-07-2015)
The Z matrix of 2 port network is given by [0.9 0.2 : 0.2 0.6]. The element Y22 of the corresponding Y matrix of the same network is given by

0.4
1.8
-0.4
1.2

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Which of the following is not function of substation batteries?

operating protective relay systems
emergency lighting circuits
provide supply to the excitation system
operating automatic control circuits

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
The steady state stability of the power systems is most effected by

voltage at generator bus
power factor of the load
transmission line reactance
stability of generator

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
The power factor of the arc in circuit breaker is

always leading
always lagging
always unity
always zero

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Fast excitation system of the generator will _____

Improve the reactive power control
Improve the voltage control
Improve the power factor
Improve the dynamic stability

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Which power plant may take several days to start up and shunt down?

Peak load
Base load
none of these
solar power plant

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (22-07-2015)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑