GETCO Exam Paper (22-07-2015) Who is the vice president of India? (As on 22/07/2015) O.P. Kohli Nazama heptulla Pranav Mukharjee Dr. Hamid Ansari O.P. Kohli Nazama heptulla Pranav Mukharjee Dr. Hamid Ansari ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Two heaters rated at 500 W, 250 V each are conneted in series across a 250 V, 50 Hz mains. The total power drawn from the supply would be _____ watt. 250 1000 500 125 250 1000 500 125 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) I _____ tennis every Sunday morning play am play playing am playing play am play playing am playing ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In load flow analysis, the load at the bus is represented as none of these a constant current drawn from the bus a voltag dependent impedance at the bus a constant impedance connected at the bus none of these a constant current drawn from the bus a voltag dependent impedance at the bus a constant impedance connected at the bus ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? angle of the voltage is not considered AVR loop response is slower than LFC loop Change in voltage magnitude marginally affects real power deference of error is the main reason angle of the voltage is not considered AVR loop response is slower than LFC loop Change in voltage magnitude marginally affects real power deference of error is the main reason ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Short circuit limit Steady state limit Transient stability limit Reactive power limit Short circuit limit Steady state limit Transient stability limit Reactive power limit ANSWER DOWNLOAD EXAMIANS APP