GETCO Exam Paper (22-07-2015) Shunt compensation in EHV line is resorted to Improve voltage profile Improve the stability Reduce the fault level Increase line impedance Improve voltage profile Improve the stability Reduce the fault level Increase line impedance ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is not true about fuel cells? no recharging is needed need more than two electrode more efficient cost is higher than batteries no recharging is needed need more than two electrode more efficient cost is higher than batteries ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? solar power plant none of these Peak load Base load solar power plant none of these Peak load Base load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) An over-current relay of current rating 5 A and setting 150% is connected to a 200/5 A CT. Then the relay to pickup, the line current required is 100 300 150 200 100 300 150 200 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Jyotigram Yojana is pertaining to Supplying resedential and other power separately Supplying 100% reliable power for street light of villages Developing agricultural land Supplying 100% reliable power to villages Supplying resedential and other power separately Supplying 100% reliable power for street light of villages Developing agricultural land Supplying 100% reliable power to villages ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Oil is mostly _____ by trucks in India transfer deliver transmit transport transfer deliver transmit transport ANSWER DOWNLOAD EXAMIANS APP