GETCO Exam Paper (22-07-2015) Shunt compensation in EHV line is resorted to Reduce the fault level Increase line impedance Improve the stability Improve voltage profile Reduce the fault level Increase line impedance Improve the stability Improve voltage profile ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which Indian hindi movie is released most recently (as on 22/07/2015)? Bin Roye Drishyam Aisa Yeh Jahaan Bajarangi Bhaijaan Bin Roye Drishyam Aisa Yeh Jahaan Bajarangi Bhaijaan ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is the wrong statement in terms of slack bus? voltage and angle is specified at this bus it has finite reactive power generation capability it should be located at the centre of the area it should be the largest generator bus in the system voltage and angle is specified at this bus it has finite reactive power generation capability it should be located at the centre of the area it should be the largest generator bus in the system ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Select the wrong statement from the following in relation to power flow analysis Approximation is used in FDLF method Y Bus is required for power flow analysis jacobian is always required No of ittretion in N R method can not be more than 30 for any system Approximation is used in FDLF method Y Bus is required for power flow analysis jacobian is always required No of ittretion in N R method can not be more than 30 for any system ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The recent (as on 22/07/2015) Mahakumbh is held at Ujjain Alahabad Nasik Haridwar Ujjain Alahabad Nasik Haridwar ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Earth wire on EHV overhead transmission line is provided to protect the line against lightning surge excessive fault voltages switching surge corona effect lightning surge excessive fault voltages switching surge corona effect ANSWER DOWNLOAD EXAMIANS APP