GETCO Exam Paper (22-07-2015) In G-S method of power flow problem, the number of iterations _____ depends on tolerance depends on voltage control buses remains fixed depends on no of buses depends on tolerance depends on voltage control buses remains fixed depends on no of buses ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Short circuit limit Steady state limit Reactive power limit Transient stability limit Short circuit limit Steady state limit Reactive power limit Transient stability limit ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Shunt capacitors in a substation consume active power consumes lagging VAR delivers lagging VAR deliver active power consume active power consumes lagging VAR delivers lagging VAR deliver active power ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The breaking capacity of a CB is usually expressed interms of amperes volts MW MVA amperes volts MW MVA ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Two watt meter method for 3 phase circuit is preferred over other methods because it can be used for balanced or unbalanced load PF of the load can also be estimated it can be used for star or delta connected load all are correct it can be used for balanced or unbalanced load PF of the load can also be estimated it can be used for star or delta connected load all are correct ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In comparison to steam plant, the annual fixed cost of nuclear plant is almost equal Quit high Quit low Can't say almost equal Quit high Quit low Can't say ANSWER DOWNLOAD EXAMIANS APP