GETCO Exam Paper (22-07-2015)
The area under the load duration curve represents

base load of the system
average load of the system
energy generated in the period considered
Maximum demand of the power station

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power?

AVR loop response is slower than LFC loop
angle of the voltage is not considered
Change in voltage magnitude marginally affects real power
deference of error is the main reason

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Which of the following is the wrong statement in terms of slack bus?

it should be the largest generator bus in the system
it should be located at the centre of the area
voltage and angle is specified at this bus
it has finite reactive power generation capability

ANSWER DOWNLOAD EXAMIANS APP