GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? Base load none of these solar power plant Peak load Base load none of these solar power plant Peak load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In differential protection scheme, a stabilizing resistance connected to increase the relay sensitivity block harmonics increase the current limit reduce the effect of non identical CTs increase the relay sensitivity block harmonics increase the current limit reduce the effect of non identical CTs ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? deference of error is the main reason Change in voltage magnitude marginally affects real power AVR loop response is slower than LFC loop angle of the voltage is not considered deference of error is the main reason Change in voltage magnitude marginally affects real power AVR loop response is slower than LFC loop angle of the voltage is not considered ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Light from the nearest star (other than the sun) reaches the earth in 42 secs 4.2 minutes 4.2 years 4.2 hours 42 secs 4.2 minutes 4.2 years 4.2 hours ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Earth wire on EHV overhead transmission line is provided to protect the line against excessive fault voltages switching surge corona effect lightning surge excessive fault voltages switching surge corona effect lightning surge ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In case of HVDC transmission there is _____ no charging current but skin effect both charging effect and skin effect no charging current no skin effect charging current but no skin effect no charging current but skin effect both charging effect and skin effect no charging current no skin effect charging current but no skin effect ANSWER DOWNLOAD EXAMIANS APP