GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? solar power plant Peak load Base load none of these solar power plant Peak load Base load none of these ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Power Factor correcting element is generally connected in _____ series with load series with source parallel to source parallel to the load series with load series with source parallel to source parallel to the load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Normally the angle of the transmission line is kept _____ because of _____ reasons 45, transient stability 45, steady state stability 90, steady state stability 90, transient stability 45, transient stability 45, steady state stability 90, steady state stability 90, transient stability ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The relay which is most sensitive to power swings (mal operation) is Over current Relay Reactance Relay Impedance Relay Mho Relay Over current Relay Reactance Relay Impedance Relay Mho Relay ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Oil is mostly _____ by trucks in India deliver transmit transport transfer deliver transmit transport transfer ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The PU impedance of a 1089 MVA, 33 kV generator is 1, the ohmic value of its impedance is: 1 100 0.5 10 1 100 0.5 10 ANSWER DOWNLOAD EXAMIANS APP