GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? none of these Peak load Base load solar power plant none of these Peak load Base load solar power plant ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The PU impedance of a 1089 MVA, 33 kV generator is 1, the ohmic value of its impedance is: 100 10 0.5 1 100 10 0.5 1 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Oil is mostly _____ by trucks in India transmit transport deliver transfer transmit transport deliver transfer ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The Z matrix of 2 port network is given by [0.9 0.2 : 0.2 0.6]. The element Y22 of the corresponding Y matrix of the same network is given by -0.4 1.8 1.2 0.4 -0.4 1.8 1.2 0.4 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Who is the vice president of India? (As on 22/07/2015) Pranav Mukharjee Dr. Hamid Ansari Nazama heptulla O.P. Kohli Pranav Mukharjee Dr. Hamid Ansari Nazama heptulla O.P. Kohli ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) For eliminating 7th harmonics from generated EMF in alternator the fractional pitch must be 6\7 7\8 5\6 2\3 6\7 7\8 5\6 2\3 ANSWER EXPLANATION DOWNLOAD EXAMIANS APP fractional pitch = Cos( α/2)α is obtain from: (nα/2)=90˚ where n is harmonicα=25.7143˚fractional pitch=6/7