GETCO Exam Paper (22-07-2015) In a thermal power plant, heat from the flue gases is recovered in Electric precipitator condenser Economizer chimney Electric precipitator condenser Economizer chimney ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Penalty factor in power system economical operation is measure of Line loss generation cost fuel cost all are correct Line loss generation cost fuel cost all are correct ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The insulation strength of an EHV transmission line is mainly governed by Switching over voltages Load power factor Corona Harmonics Switching over voltages Load power factor Corona Harmonics ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Shunt compensation in EHV line is resorted to Improve voltage profile Increase line impedance Improve the stability Reduce the fault level Improve voltage profile Increase line impedance Improve the stability Reduce the fault level ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Two heaters rated at 500 W, 250 V each are conneted in series across a 250 V, 50 Hz mains. The total power drawn from the supply would be _____ watt. 1000 125 500 250 1000 125 500 250 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) A transformer has negative voltage regulation when its load PF is lagging leading zero unity lagging leading zero unity ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Voltage regulation = ((no load voltage)-(full load voltage)/(no load voltage))VR at leading PF = ((I*R*cosφ)-(I*X*sinφ))/VVR at lagging PF = ((I*R*cosφ)+(I*X*sinφ))/V