GETCO Exam Paper (22-07-2015) In a thermal power plant, heat from the flue gases is recovered in Economizer Electric precipitator condenser chimney Economizer Electric precipitator condenser chimney ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is the most likely reason for large overshoot in a control system? high retarding torque high positive correcting torque High gain in a system presence of dead time delay high retarding torque high positive correcting torque High gain in a system presence of dead time delay ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? angle of the voltage is not considered deference of error is the main reason Change in voltage magnitude marginally affects real power AVR loop response is slower than LFC loop angle of the voltage is not considered deference of error is the main reason Change in voltage magnitude marginally affects real power AVR loop response is slower than LFC loop ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Shunt compensation in EHV line is resorted to Improve voltage profile Improve the stability Increase line impedance Reduce the fault level Improve voltage profile Improve the stability Increase line impedance Reduce the fault level ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Who is the vice president of India? (As on 22/07/2015) Nazama heptulla Pranav Mukharjee O.P. Kohli Dr. Hamid Ansari Nazama heptulla Pranav Mukharjee O.P. Kohli Dr. Hamid Ansari ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The insulation strength of an EHV transmission line is mainly governed by Corona Switching over voltages Harmonics Load power factor Corona Switching over voltages Harmonics Load power factor ANSWER DOWNLOAD EXAMIANS APP