GETCO Exam Paper (22-07-2015) In a thermal power plant, heat from the flue gases is recovered in condenser chimney Economizer Electric precipitator condenser chimney Economizer Electric precipitator ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Shunt compensation in EHV line is resorted to Reduce the fault level Improve voltage profile Improve the stability Increase line impedance Reduce the fault level Improve voltage profile Improve the stability Increase line impedance ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Who was the political Guru of Netaji? Lokmanya Tilak R. Das Sardar Patel Gokhle Lokmanya Tilak R. Das Sardar Patel Gokhle ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The area under the load duration curve represents energy generated in the period considered base load of the system average load of the system Maximum demand of the power station energy generated in the period considered base load of the system average load of the system Maximum demand of the power station ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Who is the Energy and Petrochemicals minister of Gujarat? (As on 22/07/2015) Bhupendrasinh Chudasama Saurabh Patel Nitin Patel Anandiben Patel Bhupendrasinh Chudasama Saurabh Patel Nitin Patel Anandiben Patel ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) An over-current relay of current rating 5 A and setting 150% is connected to a 200/5 A CT. Then the relay to pickup, the line current required is 300 100 200 150 300 100 200 150 ANSWER DOWNLOAD EXAMIANS APP