GETCO Exam Paper (22-07-2015) In a thermal power plant, heat from the flue gases is recovered in Economizer condenser chimney Electric precipitator Economizer condenser chimney Electric precipitator ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Reactive power limit Steady state limit Short circuit limit Transient stability limit Reactive power limit Steady state limit Short circuit limit Transient stability limit ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Babies _____ when they are hungry are crying is crying cries cry are crying is crying cries cry ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) I am looking _____ my pen. Have you seen it? to for at after to for at after ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) An over-current relay of current rating 5 A and setting 150% is connected to a 200/5 A CT. Then the relay to pickup, the line current required is 300 150 200 100 300 150 200 100 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In a power system network, at which bus the shunt is connected that can be known from type of bus reactive power demand none of these Y bus of the system type of bus reactive power demand none of these Y bus of the system ANSWER DOWNLOAD EXAMIANS APP