GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? angle of the voltage is not considered deference of error is the main reason Change in voltage magnitude marginally affects real power AVR loop response is slower than LFC loop angle of the voltage is not considered deference of error is the main reason Change in voltage magnitude marginally affects real power AVR loop response is slower than LFC loop ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) What is the synonyms of 'Pragmatic'? Arrogant Uncertain Magnetic Practical Arrogant Uncertain Magnetic Practical ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Earth wire on EHV overhead transmission line is provided to protect the line against excessive fault voltages switching surge lightning surge corona effect excessive fault voltages switching surge lightning surge corona effect ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The fault occurring in transmission actually are mostly L-L L-G L-L-G L-L-L L-L L-G L-L-G L-L-L ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The Z matrix of 2 port network is given by [0.9 0.2 : 0.2 0.6]. The element Y22 of the corresponding Y matrix of the same network is given by 0.4 1.2 1.8 -0.4 0.4 1.2 1.8 -0.4 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is the most likely reason for large overshoot in a control system? High gain in a system high retarding torque high positive correcting torque presence of dead time delay High gain in a system high retarding torque high positive correcting torque presence of dead time delay ANSWER DOWNLOAD EXAMIANS APP