GETCO Exam Paper (22-07-2015) The relay which is most sensitive to power swings (mal operation) is Reactance Relay Over current Relay Impedance Relay Mho Relay Reactance Relay Over current Relay Impedance Relay Mho Relay ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) "Overshoot" in a time response of control systems is indication of steady state solution measure of relative stability final value of the output none of this steady state solution measure of relative stability final value of the output none of this ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? none of these Base load solar power plant Peak load none of these Base load solar power plant Peak load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) For given kVAR and line voltage the ratio of star to delta value of capacitor is 1.73 1 3 0.33333333333333 1.73 1 3 0.33333333333333 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Jyotigram Yojana is pertaining to Supplying resedential and other power separately Developing agricultural land Supplying 100% reliable power to villages Supplying 100% reliable power for street light of villages Supplying resedential and other power separately Developing agricultural land Supplying 100% reliable power to villages Supplying 100% reliable power for street light of villages ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Hopkinson's test is the test to be carried out on two identical induction motors two identical DC motors induction motor with synchronous motor induction motor with any DC motor two identical induction motors two identical DC motors induction motor with synchronous motor induction motor with any DC motor ANSWER EXPLANATION DOWNLOAD EXAMIANS APP In hopkinson test known as regenerative testtwo identical machine coupledD.C shunt motorD.C shunt generatortemperature rise can be check under rated conditionlarge machine can be tested without drawing much power.