GETCO Exam Paper (22-07-2015) The relay which is most sensitive to power swings (mal operation) is Over current Relay Impedance Relay Reactance Relay Mho Relay Over current Relay Impedance Relay Reactance Relay Mho Relay ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Who was the political Guru of Netaji? Sardar Patel R. Das Lokmanya Tilak Gokhle Sardar Patel R. Das Lokmanya Tilak Gokhle ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In case of a balanced three phase sinusoidal AC supply, because of the phase difference rotating magnetic field is produced neutral wire is not required, if load is balanced neutral current is high if load is not balanced all are correct rotating magnetic field is produced neutral wire is not required, if load is balanced neutral current is high if load is not balanced all are correct ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is the most likely reason for large overshoot in a control system? presence of dead time delay high positive correcting torque High gain in a system high retarding torque presence of dead time delay high positive correcting torque High gain in a system high retarding torque ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The power factor of the arc in circuit breaker is always lagging always leading always unity always zero always lagging always leading always unity always zero ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) What is the synonyms of 'Pragmatic'? Practical Arrogant Uncertain Magnetic Practical Arrogant Uncertain Magnetic ANSWER DOWNLOAD EXAMIANS APP