GETCO Exam Paper (22-07-2015) In differential protection scheme, a stabilizing resistance connected to increase the current limit reduce the effect of non identical CTs block harmonics increase the relay sensitivity increase the current limit reduce the effect of non identical CTs block harmonics increase the relay sensitivity ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) 100% string efficiency means One of the insulator discs shorted None uniform potential distribution across each disc Zero potential across each disc Equal potential across each disc One of the insulator discs shorted None uniform potential distribution across each disc Zero potential across each disc Equal potential across each disc ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The power factor of the arc in circuit breaker is always unity always leading always zero always lagging always unity always leading always zero always lagging ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The line current in a three phase unbalanced load are Ir= 4+j6, Ib= 2-j2 and Ic= -3+j2, then zero sequence component of current will be 3 - j6 1 + j2 9 + j10 3 + j6 3 - j6 1 + j2 9 + j10 3 + j6 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? solar power plant none of these Base load Peak load solar power plant none of these Base load Peak load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The recent (as on 22/07/2015) Mahakumbh is held at Haridwar Nasik Alahabad Ujjain Haridwar Nasik Alahabad Ujjain ANSWER DOWNLOAD EXAMIANS APP