GETCO Exam Paper (22-07-2015) Two watt meter method for 3 phase circuit is preferred over other methods because it can be used for balanced or unbalanced load all are correct it can be used for star or delta connected load PF of the load can also be estimated it can be used for balanced or unbalanced load all are correct it can be used for star or delta connected load PF of the load can also be estimated ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following cable is extensively used for high tension and low tension work? VIR cable XLPE cable TRS cable PVC cable VIR cable XLPE cable TRS cable PVC cable ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) For formation of the Y bus matrix (using node voltage analysis) in power system network modelling _____ is used KCL Faraday's law KVL all are correct KCL Faraday's law KVL all are correct ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Shunt compensation in EHV line is resorted to Reduce the fault level Improve the stability Increase line impedance Improve voltage profile Reduce the fault level Improve the stability Increase line impedance Improve voltage profile ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In a power system network, at which bus the shunt is connected that can be known from Y bus of the system reactive power demand type of bus none of these Y bus of the system reactive power demand type of bus none of these ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Differential equation is required to be solved in _____ economical operation of power systems Stability studies Finding efficiency of a transmission line Load flow studies economical operation of power systems Stability studies Finding efficiency of a transmission line Load flow studies ANSWER DOWNLOAD EXAMIANS APP