GETCO Exam Paper (22-07-2015) Two watt meter method for 3 phase circuit is preferred over other methods because PF of the load can also be estimated it can be used for star or delta connected load all are correct it can be used for balanced or unbalanced load PF of the load can also be estimated it can be used for star or delta connected load all are correct it can be used for balanced or unbalanced load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) When the load is suddenly increased in the receiving end of the system, the phase shift will increase Not affected decrease remains same increase Not affected decrease remains same ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Switching surges are short duration transient voltage power frequency voltage high votage DCs high voltage Acs short duration transient voltage power frequency voltage high votage DCs high voltage Acs ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Oil is mostly _____ by trucks in India transmit deliver transfer transport transmit deliver transfer transport ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) An over-current relay of current rating 5 A and setting 150% is connected to a 200/5 A CT. Then the relay to pickup, the line current required is 200 300 100 150 200 300 100 150 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) For formation of the Y bus matrix (using node voltage analysis) in power system network modelling _____ is used Faraday's law all are correct KCL KVL Faraday's law all are correct KCL KVL ANSWER DOWNLOAD EXAMIANS APP