GETCO Exam Paper (22-07-2015) Fuel cell for power generation have drawback of _____ Noise, pollution and maintenance problems Low life span Synchronization problems Very high development costs Noise, pollution and maintenance problems Low life span Synchronization problems Very high development costs ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Earth wire on EHV overhead transmission line is provided to protect the line against corona effect lightning surge excessive fault voltages switching surge corona effect lightning surge excessive fault voltages switching surge ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Root Locus is locus of the _____ close loop poles open loop poles to open loop zeros open loop zeros to close poles close loop poles to close loop zeros close loop poles open loop poles to open loop zeros open loop zeros to close poles close loop poles to close loop zeros ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The steady state stability of the power systems is most effected by voltage at generator bus power factor of the load stability of generator transmission line reactance voltage at generator bus power factor of the load stability of generator transmission line reactance ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is the most likely reason for large overshoot in a control system? high retarding torque presence of dead time delay high positive correcting torque High gain in a system high retarding torque presence of dead time delay high positive correcting torque High gain in a system ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In a given current transformer, If permissible current ratio error rated primary current is 5% the CT is suitable for as power transformer protection purpose both measuring and protection measuring purpose as power transformer protection purpose both measuring and protection measuring purpose ANSWER DOWNLOAD EXAMIANS APP