GETCO Exam Paper (22-07-2015) Fuel cell for power generation have drawback of _____ Low life span Very high development costs Synchronization problems Noise, pollution and maintenance problems Low life span Very high development costs Synchronization problems Noise, pollution and maintenance problems ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The constraints that are to be met with while solving UC problem are Spinning reserve all are correct Minimum down time Minimum up time Spinning reserve all are correct Minimum down time Minimum up time ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Jyotigram Yojana is pertaining to Supplying 100% reliable power to villages Developing agricultural land Supplying resedential and other power separately Supplying 100% reliable power for street light of villages Supplying 100% reliable power to villages Developing agricultural land Supplying resedential and other power separately Supplying 100% reliable power for street light of villages ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The relay which is most sensitive to power swings (mal operation) is Impedance Relay Over current Relay Reactance Relay Mho Relay Impedance Relay Over current Relay Reactance Relay Mho Relay ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is the most likely reason for large overshoot in a control system? high retarding torque high positive correcting torque presence of dead time delay High gain in a system high retarding torque high positive correcting torque presence of dead time delay High gain in a system ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) No load efficiency of tranformer is _____ than full load efficiency greater lesser same depends on load greater lesser same depends on load ANSWER DOWNLOAD EXAMIANS APP