Which of the following breaking method save energy?

plugging
regenerative breaking
resistor breaking
dynamic breaking

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Which of the following is the wrong statement in terms of slack bus?

it has finite reactive power generation capability
it should be located at the centre of the area
voltage and angle is specified at this bus
it should be the largest generator bus in the system

ANSWER DOWNLOAD EXAMIANS APP