An over-current relay of current rating 5 A and setting 150% is connected to a 200/5 A CT. Then the relay to pickup, the line current required is

300
150
100
200

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
In a given current transformer, If permissible current ratio error rated primary current is 5% the CT is suitable for

both measuring and protection
protection purpose
as power transformer
measuring purpose

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
What is the Antonyms of 'ENIGMA'?

Energetic
Demise
Mystery
Understood

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Differential equation is required to be solved in _____

Finding efficiency of a transmission line
Stability studies
Load flow studies
economical operation of power systems

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Critical clearing time of a fault in a power system is related to

Transient stability limit
Short circuit limit
Steady state limit
Reactive power limit

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Fuel cell for power generation have drawback of _____

Low life span
Noise, pollution and maintenance problems
Very high development costs
Synchronization problems

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (22-07-2015)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑