GETCO Exam Paper (22-07-2015) In a DC motor, back EMF value becomes maximum at _____ 1/2 load 3/4 load no load full load 1/2 load 3/4 load no load full load ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Answer in official key is “1/2 load ”.
GETCO Exam Paper (22-07-2015) Steady state stability of a power system is improved by by fast switching reducing fault clearing time decreasing generator inertia using double circuit line instead of single circuit line by fast switching reducing fault clearing time decreasing generator inertia using double circuit line instead of single circuit line ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which Indian hindi movie is released most recently (as on 22/07/2015)? Bajarangi Bhaijaan Drishyam Aisa Yeh Jahaan Bin Roye Bajarangi Bhaijaan Drishyam Aisa Yeh Jahaan Bin Roye ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Fuel cell for power generation have drawback of _____ Low life span Very high development costs Noise, pollution and maintenance problems Synchronization problems Low life span Very high development costs Noise, pollution and maintenance problems Synchronization problems ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Select the wrong statement from the following in relation to power flow analysis jacobian is always required Approximation is used in FDLF method No of ittretion in N R method can not be more than 30 for any system Y Bus is required for power flow analysis jacobian is always required Approximation is used in FDLF method No of ittretion in N R method can not be more than 30 for any system Y Bus is required for power flow analysis ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Power Factor correcting element is generally connected in _____ series with source parallel to source parallel to the load series with load series with source parallel to source parallel to the load series with load ANSWER DOWNLOAD EXAMIANS APP