GETCO Exam Paper (22-07-2015) Which of the following is not true about fuel cells? need more than two electrode no recharging is needed more efficient cost is higher than batteries need more than two electrode no recharging is needed more efficient cost is higher than batteries ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Penalty factor in power system economical operation is measure of Line loss generation cost all are correct fuel cost Line loss generation cost all are correct fuel cost ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Two watt meter method for 3 phase circuit is preferred over other methods because it can be used for balanced or unbalanced load it can be used for star or delta connected load PF of the load can also be estimated all are correct it can be used for balanced or unbalanced load it can be used for star or delta connected load PF of the load can also be estimated all are correct ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is the wrong statement in terms of slack bus? voltage and angle is specified at this bus it has finite reactive power generation capability it should be located at the centre of the area it should be the largest generator bus in the system voltage and angle is specified at this bus it has finite reactive power generation capability it should be located at the centre of the area it should be the largest generator bus in the system ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is the most likely reason for large overshoot in a control system? high positive correcting torque presence of dead time delay High gain in a system high retarding torque high positive correcting torque presence of dead time delay High gain in a system high retarding torque ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In a given current transformer, If permissible current ratio error rated primary current is 5% the CT is suitable for both measuring and protection as power transformer protection purpose measuring purpose both measuring and protection as power transformer protection purpose measuring purpose ANSWER DOWNLOAD EXAMIANS APP