GETCO Exam Paper (22-07-2015) In load flow analysis, the load at the bus is represented as a constant current drawn from the bus none of these a constant impedance connected at the bus a voltag dependent impedance at the bus a constant current drawn from the bus none of these a constant impedance connected at the bus a voltag dependent impedance at the bus ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) 100% string efficiency means Equal potential across each disc Zero potential across each disc One of the insulator discs shorted None uniform potential distribution across each disc Equal potential across each disc Zero potential across each disc One of the insulator discs shorted None uniform potential distribution across each disc ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The PU impedance of a 1089 MVA, 33 kV generator is 1, the ohmic value of its impedance is: 1 100 0.5 10 1 100 0.5 10 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Reactive power limit Steady state limit Transient stability limit Short circuit limit Reactive power limit Steady state limit Transient stability limit Short circuit limit ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In which of the following festivals are boat races a special feature? Rongali Bihu Navaratri Pongal Onam Rongali Bihu Navaratri Pongal Onam ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? angle of the voltage is not considered deference of error is the main reason AVR loop response is slower than LFC loop Change in voltage magnitude marginally affects real power angle of the voltage is not considered deference of error is the main reason AVR loop response is slower than LFC loop Change in voltage magnitude marginally affects real power ANSWER DOWNLOAD EXAMIANS APP