GETCO Exam Paper (22-07-2015) For formation of the Y bus matrix (using node voltage analysis) in power system network modelling _____ is used KCL all are correct Faraday's law KVL KCL all are correct Faraday's law KVL ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) When the load is suddenly increased in the receiving end of the system, the phase shift will remains same increase Not affected decrease remains same increase Not affected decrease ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Oil is mostly _____ by trucks in India deliver transfer transmit transport deliver transfer transmit transport ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In a power system network, at which bus the shunt is connected that can be known from reactive power demand Y bus of the system none of these type of bus reactive power demand Y bus of the system none of these type of bus ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Normally the angle of the transmission line is kept _____ because of _____ reasons 90, steady state stability 90, transient stability 45, steady state stability 45, transient stability 90, steady state stability 90, transient stability 45, steady state stability 45, transient stability ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The constraints that are to be met with while solving UC problem are Minimum down time all are correct Spinning reserve Minimum up time Minimum down time all are correct Spinning reserve Minimum up time ANSWER DOWNLOAD EXAMIANS APP