GETCO Exam Paper (22-07-2015) For formation of the Y bus matrix (using node voltage analysis) in power system network modelling _____ is used Faraday's law all are correct KVL KCL Faraday's law all are correct KVL KCL ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Normally the angle of the transmission line is kept _____ because of _____ reasons 45, steady state stability 45, transient stability 90, transient stability 90, steady state stability 45, steady state stability 45, transient stability 90, transient stability 90, steady state stability ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Light from the nearest star (other than the sun) reaches the earth in 4.2 hours 4.2 minutes 42 secs 4.2 years 4.2 hours 4.2 minutes 42 secs 4.2 years ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Root Locus is locus of the _____ open loop poles to open loop zeros open loop zeros to close poles close loop poles to close loop zeros close loop poles open loop poles to open loop zeros open loop zeros to close poles close loop poles to close loop zeros close loop poles ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Earth wire on EHV overhead transmission line is provided to protect the line against switching surge lightning surge corona effect excessive fault voltages switching surge lightning surge corona effect excessive fault voltages ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Fuel cell for power generation have drawback of _____ Synchronization problems Noise, pollution and maintenance problems Very high development costs Low life span Synchronization problems Noise, pollution and maintenance problems Very high development costs Low life span ANSWER DOWNLOAD EXAMIANS APP