GETCO Exam Paper (22-07-2015) In a power system network, at which bus the shunt is connected that can be known from Y bus of the system type of bus reactive power demand none of these Y bus of the system type of bus reactive power demand none of these ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Differential equation is required to be solved in _____ Load flow studies Finding efficiency of a transmission line Stability studies economical operation of power systems Load flow studies Finding efficiency of a transmission line Stability studies economical operation of power systems ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The fault occurring in transmission actually are mostly L-L-G L-G L-L L-L-L L-L-G L-G L-L L-L-L ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Stray loss is equal to _____ frictional loss & copper loss field copper loss & iron loss mechanical loss & iron loss copper loss and iron loss frictional loss & copper loss field copper loss & iron loss mechanical loss & iron loss copper loss and iron loss ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Answer in official key is “mechanical loss & iron loss ”.Many times stray loss is also considered as total loss actually accured minus calculatable loss. This means loss that can be calculated is known as stray loss.
GETCO Exam Paper (22-07-2015) Light from the nearest star (other than the sun) reaches the earth in 42 secs 4.2 years 4.2 minutes 4.2 hours 42 secs 4.2 years 4.2 minutes 4.2 hours ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The constraints that are to be met with while solving UC problem are Minimum down time Minimum up time all are correct Spinning reserve Minimum down time Minimum up time all are correct Spinning reserve ANSWER DOWNLOAD EXAMIANS APP