GETCO Exam Paper (22-07-2015) In a power system network, at which bus the shunt is connected that can be known from Y bus of the system type of bus reactive power demand none of these Y bus of the system type of bus reactive power demand none of these ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Light from the nearest star (other than the sun) reaches the earth in 4.2 years 4.2 hours 4.2 minutes 42 secs 4.2 years 4.2 hours 4.2 minutes 42 secs ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Select the wrong statement from the following in relation to power flow analysis Approximation is used in FDLF method No of ittretion in N R method can not be more than 30 for any system Y Bus is required for power flow analysis jacobian is always required Approximation is used in FDLF method No of ittretion in N R method can not be more than 30 for any system Y Bus is required for power flow analysis jacobian is always required ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? deference of error is the main reason angle of the voltage is not considered Change in voltage magnitude marginally affects real power AVR loop response is slower than LFC loop deference of error is the main reason angle of the voltage is not considered Change in voltage magnitude marginally affects real power AVR loop response is slower than LFC loop ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Who is the vice president of India? (As on 22/07/2015) Dr. Hamid Ansari Pranav Mukharjee O.P. Kohli Nazama heptulla Dr. Hamid Ansari Pranav Mukharjee O.P. Kohli Nazama heptulla ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) "Overshoot" in a time response of control systems is indication of final value of the output steady state solution measure of relative stability none of this final value of the output steady state solution measure of relative stability none of this ANSWER DOWNLOAD EXAMIANS APP