GETCO Exam Paper (22-07-2015) In a power system network, at which bus the shunt is connected that can be known from Y bus of the system none of these reactive power demand type of bus Y bus of the system none of these reactive power demand type of bus ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following breaking method save energy? regenerative breaking dynamic breaking resistor breaking plugging regenerative breaking dynamic breaking resistor breaking plugging ANSWER EXPLANATION DOWNLOAD EXAMIANS APP three types of electric breaking:Regenerative breaking( leads to economic and energy consevation)pugging (more efficient method of breaking)rheostatic breaking
GETCO Exam Paper (22-07-2015) The recent (as on 22/07/2015) Mahakumbh is held at Haridwar Nasik Ujjain Alahabad Haridwar Nasik Ujjain Alahabad ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is the wrong statement in terms of slack bus? it should be located at the centre of the area voltage and angle is specified at this bus it should be the largest generator bus in the system it has finite reactive power generation capability it should be located at the centre of the area voltage and angle is specified at this bus it should be the largest generator bus in the system it has finite reactive power generation capability ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) "Overshoot" in a time response of control systems is indication of none of this final value of the output steady state solution measure of relative stability none of this final value of the output steady state solution measure of relative stability ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The line current in a three phase unbalanced load are Ir= 4+j6, Ib= 2-j2 and Ic= -3+j2, then zero sequence component of current will be 9 + j10 3 + j6 1 + j2 3 - j6 9 + j10 3 + j6 1 + j2 3 - j6 ANSWER DOWNLOAD EXAMIANS APP