In a power system network, at which bus the shunt is connected that can be known from

type of bus
reactive power demand
Y bus of the system
none of these

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Which city is capital of Meghalaya? (As on 22/07/2015)

Dispur
Imphal
Shilong
Itanagar

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Which of the following is the most likely reason for large overshoot in a control system?

high positive correcting torque
presence of dead time delay
high retarding torque
High gain in a system

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Penalty factor in power system economical operation is measure of

all are correct
Line loss
generation cost
fuel cost

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
The breaking capacity of a CB is usually expressed interms of

MW
volts
MVA
amperes

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Fast excitation system of the generator will _____

Improve the voltage control
Improve the dynamic stability
Improve the reactive power control
Improve the power factor

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (22-07-2015)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑