GETCO Exam Paper (22-07-2015) In a power system network, at which bus the shunt is connected that can be known from none of these type of bus reactive power demand Y bus of the system none of these type of bus reactive power demand Y bus of the system ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) A transformer has negative voltage regulation when its load PF is lagging unity zero leading lagging unity zero leading ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Voltage regulation = ((no load voltage)-(full load voltage)/(no load voltage))VR at leading PF = ((I*R*cosφ)-(I*X*sinφ))/VVR at lagging PF = ((I*R*cosφ)+(I*X*sinφ))/V
GETCO Exam Paper (22-07-2015) Select the wrong statement from the following in relation to power flow analysis jacobian is always required No of ittretion in N R method can not be more than 30 for any system Approximation is used in FDLF method Y Bus is required for power flow analysis jacobian is always required No of ittretion in N R method can not be more than 30 for any system Approximation is used in FDLF method Y Bus is required for power flow analysis ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) No load efficiency of tranformer is _____ than full load efficiency lesser greater same depends on load lesser greater same depends on load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) "Overshoot" in a time response of control systems is indication of measure of relative stability steady state solution none of this final value of the output measure of relative stability steady state solution none of this final value of the output ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which Indian hindi movie is released most recently (as on 22/07/2015)? Aisa Yeh Jahaan Bajarangi Bhaijaan Drishyam Bin Roye Aisa Yeh Jahaan Bajarangi Bhaijaan Drishyam Bin Roye ANSWER DOWNLOAD EXAMIANS APP