GETCO Exam Paper (22-07-2015) In a power system network, at which bus the shunt is connected that can be known from reactive power demand Y bus of the system none of these type of bus reactive power demand Y bus of the system none of these type of bus ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The rating of given on the name plate of a transformer indicates the: True power which it can supply Apparent power which it can supply Apparent power which it draws from the supply mains True power whichh it draws from the supply mains True power which it can supply Apparent power which it can supply Apparent power which it draws from the supply mains True power whichh it draws from the supply mains ANSWER EXPLANATION DOWNLOAD EXAMIANS APP The rating of given on the name plate of a transformer indicates the:Apparent power which it can supply S=V( supplied voltage)*I (load current)active power = v* i*cosφreactive power = v* i*sinφ
GETCO Exam Paper (22-07-2015) An over-current relay of current rating 5 A and setting 150% is connected to a 200/5 A CT. Then the relay to pickup, the line current required is 150 200 100 300 150 200 100 300 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Transient stability limit Reactive power limit Short circuit limit Steady state limit Transient stability limit Reactive power limit Short circuit limit Steady state limit ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Shunt capacitors in a substation consume active power consumes lagging VAR deliver active power delivers lagging VAR consume active power consumes lagging VAR deliver active power delivers lagging VAR ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? Base load solar power plant none of these Peak load Base load solar power plant none of these Peak load ANSWER DOWNLOAD EXAMIANS APP