GETCO Exam Paper (22-07-2015) In a power system network, at which bus the shunt is connected that can be known from Y bus of the system reactive power demand none of these type of bus Y bus of the system reactive power demand none of these type of bus ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) HVDC transmission is preferred to EHV AC because Its terminal equipment are inexpensive System stability can be improved Harmonic problem is avoided VAR compensation is not required in it Its terminal equipment are inexpensive System stability can be improved Harmonic problem is avoided VAR compensation is not required in it ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) An over-current relay of current rating 5 A and setting 150% is connected to a 200/5 A CT. Then the relay to pickup, the line current required is 200 300 150 100 200 300 150 100 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? Peak load solar power plant Base load none of these Peak load solar power plant Base load none of these ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Current chopping phenomenon is related to asymmetrical current capacitance switching resistance switching small inductive current asymmetrical current capacitance switching resistance switching small inductive current ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Calculate torque developed by the 3-phase, 5 HP, 4 pole induction motor runs at 1500 rpm 10 N-m 0 N-m 23.5 N-m 22 N-m 10 N-m 0 N-m 23.5 N-m 22 N-m ANSWER EXPLANATION DOWNLOAD EXAMIANS APP P = 2πTN/60 where N is speed in rpm