GETCO Exam Paper (22-07-2015) Which of the following is the wrong statement in terms of slack bus? it should be the largest generator bus in the system voltage and angle is specified at this bus it should be located at the centre of the area it has finite reactive power generation capability it should be the largest generator bus in the system voltage and angle is specified at this bus it should be located at the centre of the area it has finite reactive power generation capability ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) 100% string efficiency means Zero potential across each disc None uniform potential distribution across each disc One of the insulator discs shorted Equal potential across each disc Zero potential across each disc None uniform potential distribution across each disc One of the insulator discs shorted Equal potential across each disc ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) For a given transformer volte/turn for primary and secondary winding is depends on transformer design different same depends on load depends on transformer design different same depends on load ANSWER EXPLANATION DOWNLOAD EXAMIANS APP emf = 4.44*f*φ*Temf/T = 4.44*f*φ
GETCO Exam Paper (22-07-2015) The fault occurring in transmission actually are mostly L-L-L L-G L-L L-L-G L-L-L L-G L-L L-L-G ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The breaking capacity of a CB is usually expressed interms of volts MVA MW amperes volts MVA MW amperes ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) When the load is suddenly increased in the receiving end of the system, the phase shift will remains same decrease increase Not affected remains same decrease increase Not affected ANSWER DOWNLOAD EXAMIANS APP