GETCO Exam Paper (22-07-2015) Normally the angle of the transmission line is kept _____ because of _____ reasons 45, transient stability 45, steady state stability 90, transient stability 90, steady state stability 45, transient stability 45, steady state stability 90, transient stability 90, steady state stability ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) "Overshoot" in a time response of control systems is indication of measure of relative stability final value of the output steady state solution none of this measure of relative stability final value of the output steady state solution none of this ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? solar power plant none of these Peak load Base load solar power plant none of these Peak load Base load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Who is the vice president of India? (As on 22/07/2015) Dr. Hamid Ansari O.P. Kohli Nazama heptulla Pranav Mukharjee Dr. Hamid Ansari O.P. Kohli Nazama heptulla Pranav Mukharjee ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The area under the load duration curve represents energy generated in the period considered Maximum demand of the power station average load of the system base load of the system energy generated in the period considered Maximum demand of the power station average load of the system base load of the system ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Shunt capacitors in a substation delivers lagging VAR consume active power consumes lagging VAR deliver active power delivers lagging VAR consume active power consumes lagging VAR deliver active power ANSWER DOWNLOAD EXAMIANS APP