GETCO Exam Paper (22-07-2015) The recent (as on 22/07/2015) Mahakumbh is held at Ujjain Alahabad Nasik Haridwar Ujjain Alahabad Nasik Haridwar ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Penalty factor in power system economical operation is measure of fuel cost generation cost Line loss all are correct fuel cost generation cost Line loss all are correct ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The RMS value of the voltage u(t) = 3 + 4 cos(3t) is 7 5 3 + 2(1.41) 4.12 7 5 3 + 2(1.41) 4.12 ANSWER EXPLANATION DOWNLOAD EXAMIANS APP if voltage is given by,v(t) = V₀ + V₁ cos(3t) + V₂ cos(5t)+ …RMS value is given by,√( V₀² + (V₁/√2)² + (V₂/√2)² + …)
GETCO Exam Paper (22-07-2015) Jyotigram Yojana is pertaining to Supplying 100% reliable power to villages Supplying resedential and other power separately Developing agricultural land Supplying 100% reliable power for street light of villages Supplying 100% reliable power to villages Supplying resedential and other power separately Developing agricultural land Supplying 100% reliable power for street light of villages ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is not function of substation batteries? provide supply to the excitation system emergency lighting circuits operating protective relay systems operating automatic control circuits provide supply to the excitation system emergency lighting circuits operating protective relay systems operating automatic control circuits ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Steady state limit Short circuit limit Reactive power limit Transient stability limit Steady state limit Short circuit limit Reactive power limit Transient stability limit ANSWER DOWNLOAD EXAMIANS APP