GETCO Exam Paper (22-07-2015) The insulation strength of an EHV transmission line is mainly governed by Switching over voltages Corona Harmonics Load power factor Switching over voltages Corona Harmonics Load power factor ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In a thermal power plant, heat from the flue gases is recovered in condenser Economizer Electric precipitator chimney condenser Economizer Electric precipitator chimney ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Fast excitation system of the generator will _____ Improve the dynamic stability Improve the reactive power control Improve the voltage control Improve the power factor Improve the dynamic stability Improve the reactive power control Improve the voltage control Improve the power factor ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) 100% string efficiency means One of the insulator discs shorted Zero potential across each disc Equal potential across each disc None uniform potential distribution across each disc One of the insulator discs shorted Zero potential across each disc Equal potential across each disc None uniform potential distribution across each disc ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In case of a balanced three phase sinusoidal AC supply, because of the phase difference all are correct neutral wire is not required, if load is balanced neutral current is high if load is not balanced rotating magnetic field is produced all are correct neutral wire is not required, if load is balanced neutral current is high if load is not balanced rotating magnetic field is produced ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Normally the angle of the transmission line is kept _____ because of _____ reasons 90, transient stability 90, steady state stability 45, steady state stability 45, transient stability 90, transient stability 90, steady state stability 45, steady state stability 45, transient stability ANSWER DOWNLOAD EXAMIANS APP