GETCO Exam Paper (22-07-2015) The insulation strength of an EHV transmission line is mainly governed by Switching over voltages Harmonics Corona Load power factor Switching over voltages Harmonics Corona Load power factor ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) An over-current relay of current rating 5 A and setting 150% is connected to a 200/5 A CT. Then the relay to pickup, the line current required is 100 300 200 150 100 300 200 150 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Reactive power limit Steady state limit Transient stability limit Short circuit limit Reactive power limit Steady state limit Transient stability limit Short circuit limit ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following award was not awarded to late Dr. Abdul Kalam? Padma Bhusan Padma Vibhushan Bharat Ratna Veer Chakra Padma Bhusan Padma Vibhushan Bharat Ratna Veer Chakra ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Calculate torque developed by the 3-phase, 5 HP, 4 pole induction motor runs at 1500 rpm 0 N-m 22 N-m 23.5 N-m 10 N-m 0 N-m 22 N-m 23.5 N-m 10 N-m ANSWER EXPLANATION DOWNLOAD EXAMIANS APP P = 2πTN/60 where N is speed in rpm
GETCO Exam Paper (22-07-2015) "Overshoot" in a time response of control systems is indication of steady state solution none of this measure of relative stability final value of the output steady state solution none of this measure of relative stability final value of the output ANSWER DOWNLOAD EXAMIANS APP