Which of the following statements are correct?
(i) Advanced metering infrastructure (AMI) is typically more automated and allows real- time, on-demand interrogations with metering endpoints.
(ii) An Automated Meter Reading (AMR) device only communicates from the customer to the energy supplier.
(iii) AMR meters only provide kWh information and possible peak kW demand for the month.

(i), (ii) and (iii)
(i) and (iii) only
(i) and (ii) only
(ii) and (iii) only

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 3)
Murray loop test is performed on a faulty cable 300 m long. At balance, the resistance connected to the faulty core was set at 20 Ω and the resistance of the resistor connected to the sound core was 40 Ω. Calculate the distance of the fault point from the test end.

200 m
400 m
300 m
100 m

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 3)
Determine the ohmic value of the current limiting reactor per phase external to a 40 MVA, 15 kV, 50 Hz, three phase synchronous generator which can limit the current on short circuit of 6 times the full load current. The reactance of the synchronous generator is 0.06 pu.

0.6 Ω
0.4 Ω
0.8 Ω
0.2 Ω