MGVCL Exam Paper (30-07-2021 Shift 3) Which of the following medium is used between CPU and RAM to speed up the processing power of a CPU? Virtual memory DRAM Cache memory Flash memory Virtual memory DRAM Cache memory Flash memory ANSWER DOWNLOAD EXAMIANS APP
MGVCL Exam Paper (30-07-2021 Shift 3) A single phase full converter bridge, connected to 230 V, 50 Hz source is feeding a load R =10 Ω in series with a large inductance that makes the load current ripple free. For a firing angle of 450, calculate the rectification efficiency. 28.33% 76.66% 50.55% 63.66% 28.33% 76.66% 50.55% 63.66% ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Rectification efficiency = DC output power/AC input power
MGVCL Exam Paper (30-07-2021 Shift 3) The International boundary 'Radcliffe Line’ lies between India and Pakistan Japan Afghanistan China Pakistan Japan Afghanistan China ANSWER DOWNLOAD EXAMIANS APP
MGVCL Exam Paper (30-07-2021 Shift 3) In a power network, 375 kV is recorded at a 400 kV bus. A 45 MVAR, 400 kV shunt reactor is connected to the bus. What is the reactive power absorbed by the shunt reactor? 39.55 MVAR 49.55 MVAR 59.55 MVAR 69.55 MVAR 39.55 MVAR 49.55 MVAR 59.55 MVAR 69.55 MVAR ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Q = V²/XX = 400²/45= 3555.55 ohmFor 375 kV,Q = 375²/3555.55= 39.55 kVAR
MGVCL Exam Paper (30-07-2021 Shift 3) A 3 pF capacitor is charged by a constant current of 2 pA for six seconds. The voltage across the capacitor at the end of charging will be 6 V 8 V 2 V 4 V 6 V 8 V 2 V 4 V ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Equation know that the charge stored in a capacitor is given as:Q = C*VQ = I*tV = (I*t)/C= (2μ*6)/(3μ)= 4 V
MGVCL Exam Paper (30-07-2021 Shift 3) The sites where the capacity factor is ____ are not considered suitable for wind power generation. greater than 12% less than 12% greater than 24% less than 24% greater than 12% less than 12% greater than 24% less than 24% ANSWER EXPLANATION DOWNLOAD EXAMIANS APP The capacity factor is the ratio of an actual electrical energy output over a given period of time to the maximum possible electrical energy output over that period.Nuclear power plants are at the high end of the range of capacity factors