MGVCL Exam Paper (30-07-2021 Shift 3)
In two-part tariff, the ____ charges depend upon the maximum demand of the consumer and the ____ charges depend upon the number of units consumed by the consumer.

fixed, running
semi-fixed, running
fixed, semi-fixed
running, fixed

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 3)
The sites where the capacity factor is ____ are not considered suitable for wind power generation.

greater than 24%
greater than 12%
less than 12%
less than 24%

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP