Docks and Harbor Engineering Which of the following is a fixed type mooring accessory ? anchors cables bollard buoys anchors cables bollard buoys ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Assertion A : Intervention of undulations in the sea bed reduces the depth of wave at the section.Reason R : No wave can have a height greater than the depth of water through which it passes.Select your answer based on the coding system given below: A is false but R is true. Both A and R are true and R is correct explanation of A. Both A and R are true but R is not the correct explanation of A. A is true but R is false. A is false but R is true. Both A and R are true and R is correct explanation of A. Both A and R are true but R is not the correct explanation of A. A is true but R is false. ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Assertion A : Depth and width required at the entrance to a harbour are more than those required in the channel.Reason R : The entrance to a harbour is usually more exposed to waves as compared to the harbour itself.Select your answer based on the coding system given below: Both A and R are true but R is not the correct explanation of A. A is true but R is false. Both A and R are true and R is the correct explanation of A. A is false but R is true. Both A and R are true but R is not the correct explanation of A. A is true but R is false. Both A and R are true and R is the correct explanation of A. A is false but R is true. ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering When a wave strikes a vertical breakwater in deep water, it is reflected back and on meeting another advancing wave of similar amplitude merges and rises vertically in a wall of water. This phenomenon is called Swell Clapotis Fetch Surf Swell Clapotis Fetch Surf ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Minimum width of ship clearance shall be (where “B” is beam of the design vessel) 1.5 B 1.5 B or 50 m 50 m B or 30 m 1.5 B 1.5 B or 50 m 50 m B or 30 m ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering As compared to wall type breakwater, mound type breakwater Results in less damage due to gradual failure Requires skilled labor Requires less material Requires low maintenance cost Results in less damage due to gradual failure Requires skilled labor Requires less material Requires low maintenance cost ANSWER DOWNLOAD EXAMIANS APP