Docks and Harbor Engineering Which of the following is a fixed type mooring accessory ? anchors bollard cables buoys anchors bollard cables buoys ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Dead weight tonnage of a ship(i) varies with latitude and season(ii) is more than displacement tonnage(iii) is the difference between displacement load and displacement light of these statements Only (iii) is correct (i) and (ii) are correct (ii) and (iii) are correct (i) and (iii) are correct Only (iii) is correct (i) and (ii) are correct (ii) and (iii) are correct (i) and (iii) are correct ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering If H is the height of the wave expected, then the height of the breakwater is generally taken as 1.2 H to 1.25 H above the low water level 1.2 H to 1.25 H above the datum 1.2 H to 1.25 H above the mean sea level 1.2 H to 1.25 H above the high water level 1.2 H to 1.25 H above the low water level 1.2 H to 1.25 H above the datum 1.2 H to 1.25 H above the mean sea level 1.2 H to 1.25 H above the high water level ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Assertion A : Large size stones are required in stone revetment in shore protection.Reason R : Resistance of stone to wave force is proportional to its volume and wave force is proportional to the exposed area of the stone.Select your answer based on the coding system given below. A is false but R is true. Both A and R are true but R is not a correct explanation of A. A is true but R is false. Both A and R are true and R is the correct explanation of A. A is false but R is true. Both A and R are true but R is not a correct explanation of A. A is true but R is false. Both A and R are true and R is the correct explanation of A. ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Which of the following type of sea walls results in greatest protection of shore structures? stepped sea wall sea wall with batter vertical sea wall sea wall with concave face stepped sea wall sea wall with batter vertical sea wall sea wall with concave face ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering In multiple point mooring system, vessel is secured to minimum of Two points Eight points Four points Six points Two points Eight points Four points Six points ANSWER DOWNLOAD EXAMIANS APP