Docks and Harbor Engineering Which of the following is a fixed type mooring accessory ? cables anchors buoys bollard cables anchors buoys bollard ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering The maximum harbour depth below lowest low water is generally equal to(i) loaded draft + 1.2 m when bottom is rock(ii) loaded draft + 1.8 m when bottom is soft(iii) loaded draft + 1.2 m when bottom is soft(iv) loaded draft + 1.8 m when bottom is rock (i) and (iii) are correct (iii) and (iv) are correct (ii) and (iv) are correct (i) and (ii) are correct (i) and (iii) are correct (iii) and (iv) are correct (ii) and (iv) are correct (i) and (ii) are correct ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering In basins subjected to strong winds and tide, the length of the berthing area should not be less than The length of design vessel + 20% clearance between adjacent vessels The length of design vessel + 10% clearance between adjacent vessels The length of design vessel Twice the length of design vessel The length of design vessel + 20% clearance between adjacent vessels The length of design vessel + 10% clearance between adjacent vessels The length of design vessel Twice the length of design vessel ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Consider the following statements in regard to Beaufort scale for wind speeds,(i) The Beaufort number ranges from 1 to 12.(ii) Higher Beaufort number indicates higher speed of wind,(iii) Beaufort number for calm is smallest and for hurricane is highest of these statements (i), (ii) and (iii) are correct (ii) and (iii) are correct (i) and (iii) are correct (i) and (ii) are correct (i), (ii) and (iii) are correct (ii) and (iii) are correct (i) and (iii) are correct (i) and (ii) are correct ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Which of the following structures protects the shore by trapping of littoral drift? revetments moles groynes sea walls revetments moles groynes sea walls ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering The most popular method of construction of wall breakwaters is Barge method Low level method None of these Staging method Barge method Low level method None of these Staging method ANSWER DOWNLOAD EXAMIANS APP