Docks and Harbor Engineering Which of the following is a fixed type mooring accessory ? bollard anchors buoys cables bollard anchors buoys cables ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering When a ship floats at its designed water line, the vertical distance from water line to the bottom of the ship is known as Free-board Beam Depth Draft Free-board Beam Depth Draft ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Assertion A : Marine structures are made specially bulky and strong.Reason R : Sea insects result in undermining of the hardest and the soundest building material. Select your answer based on the coding system given below: A is true but R is false. Both A and R are true and R is the correct explanation of A. A is false but R is true. Both A and R are true but R is not the correct explanation of A. A is true but R is false. Both A and R are true and R is the correct explanation of A. A is false but R is true. Both A and R are true but R is not the correct explanation of A. ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering The maximum harbour depth below lowest low water is generally equal to(i) loaded draft + 1.2 m when bottom is rock(ii) loaded draft + 1.8 m when bottom is soft(iii) loaded draft + 1.2 m when bottom is soft(iv) loaded draft + 1.8 m when bottom is rock (i) and (ii) are correct (i) and (iii) are correct (ii) and (iv) are correct (iii) and (iv) are correct (i) and (ii) are correct (i) and (iii) are correct (ii) and (iv) are correct (iii) and (iv) are correct ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Which of the following conditions of loading imposes the greatest load on the foundation in case of dry docks? When the dock is full of water When the dock is dry and is under construction When the dock is empty with the ship of maximum tonnage When the dock is empty When the dock is full of water When the dock is dry and is under construction When the dock is empty with the ship of maximum tonnage When the dock is empty ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering If H is the height of the wave expected, then the height of the breakwater is generally taken as 1.2 H to 1.25 H above the mean sea level 1.2 H to 1.25 H above the datum 1.2 H to 1.25 H above the low water level 1.2 H to 1.25 H above the high water level 1.2 H to 1.25 H above the mean sea level 1.2 H to 1.25 H above the datum 1.2 H to 1.25 H above the low water level 1.2 H to 1.25 H above the high water level ANSWER DOWNLOAD EXAMIANS APP