Docks and Harbor Engineering If H is the height of the wave expected, then the height of the breakwater is generally taken as 1.2 H to 1.25 H above the mean sea level 1.2 H to 1.25 H above the datum 1.2 H to 1.25 H above the low water level 1.2 H to 1.25 H above the high water level 1.2 H to 1.25 H above the mean sea level 1.2 H to 1.25 H above the datum 1.2 H to 1.25 H above the low water level 1.2 H to 1.25 H above the high water level ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Which of the following type of sea walls results in greatest protection of shore structures? sea wall with batter vertical sea wall sea wall with concave face stepped sea wall sea wall with batter vertical sea wall sea wall with concave face stepped sea wall ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Dead weight tonnage of a ship(i) varies with latitude and season(ii) is more than displacement tonnage(iii) is the difference between displacement load and displacement light Of these statements (i) and (iii) are correct (ii) and (iii) are correct Only (iii) is correct (i) and (ii) are correct (i) and (iii) are correct (ii) and (iii) are correct Only (iii) is correct (i) and (ii) are correct ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering A ship is berthed in a chamber and lifted by principles of buoyancy Such a chamber is called. Wet dock Dry dock Floating dock Refuge dock Wet dock Dry dock Floating dock Refuge dock ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Which of the following structures protects the shore by trapping of littoral drift? revetments sea walls groynes moles revetments sea walls groynes moles ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering In multiple point mooring system, vessel is secured to minimum of Two points Eight points Four points Six points Two points Eight points Four points Six points ANSWER DOWNLOAD EXAMIANS APP