Docks and Harbor Engineering If H is the height of the wave expected, then the height of the breakwater is generally taken as 1.2 H to 1.25 H above the high water level 1.2 H to 1.25 H above the low water level 1.2 H to 1.25 H above the datum 1.2 H to 1.25 H above the mean sea level 1.2 H to 1.25 H above the high water level 1.2 H to 1.25 H above the low water level 1.2 H to 1.25 H above the datum 1.2 H to 1.25 H above the mean sea level ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering The significant wave height is defined is the average height of the one – third highest waves one – fifth highest waves one – fourth highest waves one – tenth highest waves one – third highest waves one – fifth highest waves one – fourth highest waves one – tenth highest waves ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Consider the following statements.(i) Fender is the cushion provided on the face of the jetty for ships to come in contact,(ii) Slip is the space of water area between two adjacent piers where ships are berthed,(iii) Pier head is a structure constructed near the tip of a break water near the harbour entrance. Of the statements (ii) and (iii) are correct (i) and (iii) are correct (i) and (ii) are correct (i), (ii) and (iii) are correct (ii) and (iii) are correct (i) and (iii) are correct (i) and (ii) are correct (i), (ii) and (iii) are correct ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering In multiple point mooring system, vessel is secured to minimum of Eight points Four points Two points Six points Eight points Four points Two points Six points ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering In a two lane channel, bottom width of channel is given by Manoeuvring lane + (2 × Bank clearance lane) Manoeuvring lane + (2 × Bank clearance lane) + ship clearance lane (2 × Manoeuvring lane) + (2 × Bank clearance lane) (2 × Manoeuvring lane) + (2 × Bank clearance lane + ship clearance lane) Manoeuvring lane + (2 × Bank clearance lane) Manoeuvring lane + (2 × Bank clearance lane) + ship clearance lane (2 × Manoeuvring lane) + (2 × Bank clearance lane) (2 × Manoeuvring lane) + (2 × Bank clearance lane + ship clearance lane) ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering If ‘Hs’ is the significant wave height, then the average wave height and highest wave height respectively are given by 0.6 Hs and 1.87 Hs 1.27 Hs and 1.87 Hs 1.27 Hs and 1.67 Hs 0.6 Hs and 1.67 Hs 0.6 Hs and 1.87 Hs 1.27 Hs and 1.87 Hs 1.27 Hs and 1.67 Hs 0.6 Hs and 1.67 Hs ANSWER DOWNLOAD EXAMIANS APP