Docks and Harbor Engineering If H is the height of the wave expected, then the height of the breakwater is generally taken as 1.2 H to 1.25 H above the datum 1.2 H to 1.25 H above the low water level 1.2 H to 1.25 H above the mean sea level 1.2 H to 1.25 H above the high water level 1.2 H to 1.25 H above the datum 1.2 H to 1.25 H above the low water level 1.2 H to 1.25 H above the mean sea level 1.2 H to 1.25 H above the high water level ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering At a given port, the fetch is 400 nautical miles, the maximum height of storm wave will be 6.8 m 8.169 m 9.144 m 2.073 m 6.8 m 8.169 m 9.144 m 2.073 m ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Assertion A : Marine structures are made specially bulky and strong.Reason R : Sea insects result in undermining of the hardest and the soundest building material. Select your answer based on the coding system given below: A is true but R is false. Both A and R are true and R is the correct explanation of A. Both A and R are true but R is not the correct explanation of A. A is false but R is true. A is true but R is false. Both A and R are true and R is the correct explanation of A. Both A and R are true but R is not the correct explanation of A. A is false but R is true. ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering The minimum diameter of turning besin, where ships turn by going ahead and without tug assistance should be 1.5 L 4.0 L 1 L 2.0 L 1.5 L 4.0 L 1 L 2.0 L ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Consider the following statements in regard to Beaufort scale for wind speeds,(i) The Beaufort number ranges from 1 to 12.(ii) Higher Beaufort number indicates higher speed of wind,(iii) Beaufort number for calm is smallest and for hurricane is highest of these statements (ii) and (iii) are correct (i) and (ii) are correct (i), (ii) and (iii) are correct (i) and (iii) are correct (ii) and (iii) are correct (i) and (ii) are correct (i), (ii) and (iii) are correct (i) and (iii) are correct ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering The most popular method of construction of wall breakwaters is Barge method None of these Staging method Low level method Barge method None of these Staging method Low level method ANSWER DOWNLOAD EXAMIANS APP