Docks and Harbor Engineering If H is the height of the wave expected, then the height of the breakwater is generally taken as 1.2 H to 1.25 H above the mean sea level 1.2 H to 1.25 H above the datum 1.2 H to 1.25 H above the low water level 1.2 H to 1.25 H above the high water level 1.2 H to 1.25 H above the mean sea level 1.2 H to 1.25 H above the datum 1.2 H to 1.25 H above the low water level 1.2 H to 1.25 H above the high water level ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Which of the following is a fixed type mooring accessory ? cables buoys anchors bollard cables buoys anchors bollard ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Which of the following conditions of loading imposes the greatest load on the foundation in case of dry docks? When the dock is empty with the ship of maximum tonnage When the dock is empty When the dock is full of water When the dock is dry and is under construction When the dock is empty with the ship of maximum tonnage When the dock is empty When the dock is full of water When the dock is dry and is under construction ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering For designing the dock, the proportion of ship load assumed to be borne by keel blocks is 43967 43906 43959 43898 43967 43906 43959 43898 ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Assertion A : Large size stones are required in stone revetment in shore protection.Reason R : Resistance of stone to wave force is proportional to its volume and wave force is proportional to the exposed area of the stone.Select your answer based on the coding system given below. A is true but R is false. Both A and R are true and R is the correct explanation of A is false but R is true. Both A and R are true but R is not a correct explanation of A is true but R is false. Both A and R are true and R is the correct explanation of A is false but R is true. Both A and R are true but R is not a correct explanation of ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering In a two lane channel, bottom width of channel is given by (2 × Manoeuvring lane) + (2 × Bank clearance lane) Manoeuvring lane + (2 × Bank clearance lane) + ship clearance lane Manoeuvring lane + (2 × Bank clearance lane) (2 × Manoeuvring lane) + (2 × Bank clearance lane + ship clearance lane) (2 × Manoeuvring lane) + (2 × Bank clearance lane) Manoeuvring lane + (2 × Bank clearance lane) + ship clearance lane Manoeuvring lane + (2 × Bank clearance lane) (2 × Manoeuvring lane) + (2 × Bank clearance lane + ship clearance lane) ANSWER DOWNLOAD EXAMIANS APP