Docks and Harbor Engineering If H is the height of the wave expected, then the height of the breakwater is generally taken as 1.2 H to 1.25 H above the high water level 1.2 H to 1.25 H above the mean sea level 1.2 H to 1.25 H above the datum 1.2 H to 1.25 H above the low water level 1.2 H to 1.25 H above the high water level 1.2 H to 1.25 H above the mean sea level 1.2 H to 1.25 H above the datum 1.2 H to 1.25 H above the low water level ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Assertion A : Depth and width required at the entrance to a harbour are more than those required in the channel.Reason R : The entrance to a harbour is usually more exposed to waves as compared to the harbour itself.Select your answer based on the coding system given below: Both A and R are true but R is not the correct explanation of A. Both A and R are true and R is the correct explanation of A. A is false but R is true. A is true but R is false. Both A and R are true but R is not the correct explanation of A. Both A and R are true and R is the correct explanation of A. A is false but R is true. A is true but R is false. ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering The most popular method of construction of wall breakwaters is Low level method None of these Staging method Barge method Low level method None of these Staging method Barge method ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering A ship is berthed in a chamber and lifted by principles of buoyancy Such a chamber is called. Floating dock Wet dock Refuge dock Dry dock Floating dock Wet dock Refuge dock Dry dock ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering In a two lane channel, bottom width of channel is given by Manoeuvring lane + (2 × Bank clearance lane) Manoeuvring lane + (2 × Bank clearance lane) + ship clearance lane (2 × Manoeuvring lane) + (2 × Bank clearance lane) (2 × Manoeuvring lane) + (2 × Bank clearance lane + ship clearance lane) Manoeuvring lane + (2 × Bank clearance lane) Manoeuvring lane + (2 × Bank clearance lane) + ship clearance lane (2 × Manoeuvring lane) + (2 × Bank clearance lane) (2 × Manoeuvring lane) + (2 × Bank clearance lane + ship clearance lane) ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Assertion A : Large size stones are required in stone revetment in shore protection.Reason R : Resistance of stone to wave force is proportional to its volume and wave force is proportional to the exposed area of the stone.Select your answer based on the coding system given below. A is false but R is true. Both A and R are true but R is not a correct explanation of Both A and R are true and R is the correct explanation of A is true but R is false. A is false but R is true. Both A and R are true but R is not a correct explanation of Both A and R are true and R is the correct explanation of A is true but R is false. ANSWER DOWNLOAD EXAMIANS APP