MGVCL Exam Paper (30-07-2021 Shift 2)
Which of the following does the term 'feeder automation' include?

All of these
feeder remote point voltage control
automatic reclosing
substation reactive power control

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
In a 3-phase, 4-wire, 400/230 V system, a lamp (L1) of 100 W is connected to one phase and neutral and a lamp (L2) of 150 W is connected to the second pahse and neutral. If the neutral wire is disconnected accidently, then

100 W lamp (L1) becomes brighter and 150 W lamp (L2) becomes dim
both 100 W lamp (L1) and 150 W lamp (L2) becomes dim
100 W lamp (L1) becomes dim and 150 W lamp (L2) becomes brighter
both 100 W lamp (L1) and 150 W lamp (L2) becomes brighter

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
Consider a solar PV plant with the following specific conditions: Analysis period: 1 year
Measured average solar irradiation intensity in 1 year: 120 kWh/m²
Generator area of the PV plant: 10 m²
Efficiency factor of the PV modules: 15%
Electrical energy actually exported by plant to grid: 110 kWh
Calculate the performance ratio.

0.8111
0.5111
0.7111
0.6111

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP