MGVCL Exam Paper (30-07-2021 Shift 2)
If no load is connected to solar PV system,

it will stop absorbing light
its voltage will go on increasing till its breakdown
it will dissipate energy in the panel and increase its temperature
it will start reflecting the light

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
The magnitude of the generator earth-fault current is limited by

inserting the stabilizing resistance in series with the relay
inserting suitable resistance in neutral grounding circuit
using higher rating CTs
controlling field exciter

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
Which one of the following statement with respect to Aerial Bunched Cables (ABC) system is TRUE?

The overall cost of the ABC system is very high as compared to the bare conductor system.
ABC system requires more clearance, insulators and high maintenance.
ABC system totally eliminates the fault on lines and thereby improving the quality of supply.
ABC system is not suitable for rural electrification which are situated in difficult terrain, hills, forests and coastal areas.

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP