MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Mundra Thermal Power Station
Vindhyachal Thermal Power Station
Talcher Super Thermal Power Station
Sasan Ultra Mega Power Plant

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Murray loop test is performed on a faulty cable 300 m long. At balance, the resistance connected to the faulty core was set at 15 Ω and the resistance of the resistor connected to the sound core was 45 Ω. Calculate the distance of the fault point from the test end.

225 m
150 m
75 m
450 m

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
In a single phase energy meter, the series electromagnet is energized by a ___ of ___

current coil, thin wire of more turns
voltage coil, thin wire of more turns
current coil, thick wire of few turns
voltage coil, thick wire of few turns

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP