MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Talcher Super Thermal Power Station
Vindhyachal Thermal Power Station
Sasan Ultra Mega Power Plant
Mundra Thermal Power Station

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
___ is the short time reduction in the rms voltage between 0.1 to 0.9 p.u for a duration of ___

Voltage swell, greater than 1 minute
Voltage sag, 0.5 cycle to 1 minute.
Voltage sag, greater than 1 minute
Voltage swell, 0.5 cycle to 1 minute.

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Match the following

A = (ii), B = (iii), C = (i)
A = (ii), B = (i), C = (iii)
A = (iii), B = (i), C = (ii)
A = (iii), B = (ii), C = (i)

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Determine maximum permissible load which a 15 MVA, ONAN cooled transformer to IS : 2026 can take for 6 hr, if the initial load on it was 12 MVA. The weighted ambient temperature is 20˚C. Assume the permissible load kVA as a fraction of rated kVA is 1.25.

9.6 MVA
18.75 MVA
12 MVA
15 MVA

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP