MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Mundra Thermal Power Station
Vindhyachal Thermal Power Station
Sasan Ultra Mega Power Plant
Talcher Super Thermal Power Station

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Case 1: The PV connected to the DC bus was injecting 20 kW of power constituting of 1 kW of loss
Case 2: The same PV is connected to the AC bus constituting to 1.5 kW loss. Find out the change in efficiency from Case 1 to Case 2?

5% increase
5% decrease
2.5% increase
2.5% decrease

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Voltage dips cannot be caused by which of the following:

Local and Remote faults
Inductive Loading
Capacitive Switching
Switching on of Large Loads

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A thermistor is inherently suitable for temperature measurement involving

high span and low sensitivity
low span and low sensitivity
low span and high sensitivity
high span and high sensitivity

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP