MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Talcher Super Thermal Power Station
Vindhyachal Thermal Power Station
Mundra Thermal Power Station
Sasan Ultra Mega Power Plant

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A THHN conductor will have 75°C termination on one end and a 60/75°C termination on the other, which ampacity column will be used?

None of these
75°C column
90°C column
60°C column

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
The necessary equation to be solved during the load flow analysis using Fast-Decoupled methid is given below:
where B' and B'' are formed using the imaginary part of the bus admittance matrix Ybus, n is the total number of buses in the system, m is the number of voltage regulated buses. The size of matrix B' is
∆P/|Vi|= -B' ∆δ
∆Q/|Vi| = -B'' ∆|Vi|

(n-1) x (n-1)
(m-1) x (m-1)
(n-m-1) x (n-m-1)
(n-m) x (n-m)

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A given solar cell has the following specifications: Isc = 4 A and Voc = 0.7 V. Consider that 20 identical cells with the above specifications are to be interconnected to create a PV module. What is the open-circuit voltage of the PV module if all the solar cells are connected in a series configuration?

11.2 V
0.7 V
14 V
12.6 V

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP