MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Mundra Thermal Power Station
Sasan Ultra Mega Power Plant
Vindhyachal Thermal Power Station
Talcher Super Thermal Power Station

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Stability of power system can be improved by
1. Reducing voltage of transmission
2. Using parallel transmission lines
3. Using series compensators
Which of the above statements are correct?

2 and 3 only
1 and 3 only
All 1, 2 and 3
1 and 2 only

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Murray loop test is performed on a faulty cable 300 m long. At balance, the resistance connected to the faulty core was set at 15 Ω and the resistance of the resistor connected to the sound core was 45 Ω. Calculate the distance of the fault point from the test end.

450 m
225 m
150 m
75 m

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Which among the following are included in the two part tariff?
i. Fixed charges
ii. Running charges
iii. Semi fixed charges

(ii) and (iii) only
(i), (ii) and (iii)
(i) and (iii) only
(i) and (ii) only

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP