MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Mundra Thermal Power Station
Vindhyachal Thermal Power Station
Sasan Ultra Mega Power Plant
Talcher Super Thermal Power Station

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
The expression for voltage regulation of a short transmission line for lagging power factor is given by: ___, where, 'I' is the line current, 'V_r' is the receiving end voltage, 'R' is the line resistance and 'X' is the line reactance.

(IX cosφ_r - IR sinφ_r)/V_r
(IR cosφ_r - IX sinφ_r)/V_r
(IR cosφ_r + IX sinφ_r)/V_r
(IX cosφ_r + IR sinφ_r)/V_r

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Consider the following statements and choose the correct option:
Statement 1: The magnitude of earth fault current for a given fault position within a winding depends upon the method of neutral grounding.
Statement 2: Earth fault protection for an electric motor is provided by means of instantaneous overcurrent relay.

Both Statement 1 and Statement 2 are TRUE
Statement 1 is TRUE and Statement 2 is FALSE
Statement 1 is FALSE and Statement 2 is TRUE
Both Statement 1 and Statement 2 are FALSE

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A single phase motor connected to 400 V, 50 Hz supply takes 30 A at a power factor of 0.7 lagging. Calculate the capacitance required in parallel with the motor to raise the power factor to 0.9 lagging.

69.5 μF
89.5 μF
99.5 μF
79.5 μF

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP