MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Talcher Super Thermal Power Station
Mundra Thermal Power Station
Sasan Ultra Mega Power Plant
Vindhyachal Thermal Power Station

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
In underground cables, the electrostatic stress is ___ at contactor surface and ___ at the sheath.

zero, zero
minimum, maximum
minimum, maximum
zero, minimum

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
As per ___ guidelines, if the ratio of carbon dioxide (CO₂) and carbon monoxide (CO) in dissolved gas analysis is ___, it is predicted that the condition of paper insulation inside the transformer is poor.

IEC-599, less than 11
IEC-899, more than 11
IEC-899, less than 11
IEC-599, more than 11

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Stability of power system can be improved by
1. Reducing voltage of transmission
2. Using parallel transmission lines
3. Using series compensators
Which of the above statements are correct?

All 1, 2 and 3
1 and 2 only
1 and 3 only
2 and 3 only

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP