What is the largest thermal power plant in India?

Talcher Super Thermal Power Station
Vindhyachal Thermal Power Station
Sasan Ultra Mega Power Plant
Mundra Thermal Power Station

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
___ is the short time reduction in the rms voltage between 0.1 to 0.9 p.u for a duration of ___

Voltage sag, 0.5 cycle to 1 minute.
Voltage swell, 0.5 cycle to 1 minute.
Voltage sag, greater than 1 minute
Voltage swell, greater than 1 minute

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A balanced delta connected load of 8+j6 Ω per phase is connected to a 415 V, 50 Hz, 3-phase supply lines. If the input power factor is improved to 0.9 by connecting a star connected capacitor bank, then the required kVAR of the bank is

8.98 kVAR
16.98 kVAR
10.98 kVAR
14.98 kVAR