MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Vindhyachal Thermal Power Station
Talcher Super Thermal Power Station
Sasan Ultra Mega Power Plant
Mundra Thermal Power Station

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A 16 A, Type B Miniature Circuit Breaker (MCB) will disconnect a fault in 0.1s when the fault current is

less than 16 A
greater than 32 A
between 48 A and 80 A
less than 16 A

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A single phase motor connected to 400 V, 50 Hz supply takes 30 A at a power factor of 0.7 lagging. Calculate the capacitance required in parallel with the motor to raise the power factor to 0.9 lagging.

99.5 μF
79.5 μF
69.5 μF
89.5 μF

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP