MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Sasan Ultra Mega Power Plant
Talcher Super Thermal Power Station
Mundra Thermal Power Station
Vindhyachal Thermal Power Station

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A single phase motor connected to 400 V, 50 Hz supply takes 30 A at a power factor of 0.7 lagging. Calculate the capacitance required in parallel with the motor to raise the power factor to 0.9 lagging.

99.5 μF
69.5 μF
89.5 μF
79.5 μF

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP