MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Sasan Ultra Mega Power Plant
Talcher Super Thermal Power Station
Vindhyachal Thermal Power Station
Mundra Thermal Power Station

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
In a 3-phase, 4-wire, 400/230 V system, a lamp (L1) of 100 W is connected to one phase and neutral and a lamp (L2) of 150 W is connected to the second pahse and neutral. If the neutral wire is disconnected accidently, what will be the voltage across a 100 W lamp (L1)?

240V
180V
160 V
120V

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
___ is the short time reduction in the rms voltage between 0.1 to 0.9 p.u for a duration of ___

Voltage swell, greater than 1 minute
Voltage sag, 0.5 cycle to 1 minute.
Voltage swell, 0.5 cycle to 1 minute.
Voltage sag, greater than 1 minute

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP