MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Vindhyachal Thermal Power Station
Sasan Ultra Mega Power Plant
Mundra Thermal Power Station
Talcher Super Thermal Power Station

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A balanced delta connected load of 8+j6 Ω per phase is connected to a 415 V, 50 Hz, 3-phase supply lines. If the input power factor is improved to 0.9 by connecting a star connected capacitor bank, then the required kVAR of the bank is

16.98 kVAR
8.98 kVAR
14.98 kVAR
10.98 kVAR

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Insulation Power Factor testing on an oil-filled transformer is not helpful in determining ___

Turns ratio values
Movement of the windings (change in capacitance)
Whether the oil test indicates moisture
Condition of paper insulation (change in watts losses)

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
In underground cables, the electrostatic stress is ___ at contactor surface and ___ at the sheath.

zero, minimum
zero, zero
minimum, maximum
minimum, maximum

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A grid interactive solar system:

always receives power from the grid
supplies power to as well as receives power from the grid as required
always supplies power to the grid
works only when the grid fails

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP