Tank - Name of power station - capacity 1 - Vindhyachal Thermal Power Station - 4,760MW. 2 - Mundra Thermal Power Station - 4620 MW 3 - The Sasan Ultra Mega power plant - 3960 MW 4 - The Tiroda thermal power plant - 3300 MW
The second generation of smart meters are known as SMETS 2. Full form of SMET is Smart Metering Equipment Technical Specifications. It is with the previous generation known as SMETS 1. SMETS 2 smart meters were introduced in 2018.
Voltage sag: It is usually associated with system faults but can also be caused by energization of heavy loads or starting of large motors. Voltage sag is the short reduction in the RMS voltage between 0.1 to 0.9 pu for a duration of 0.5 cycle to 1 minute