What is the largest thermal power plant in India?

Sasan Ultra Mega Power Plant
Mundra Thermal Power Station
Vindhyachal Thermal Power Station
Talcher Super Thermal Power Station

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
While selecting the gas for a circuit breaker, the property of gas that should be considered is its
(i) dielectric strength
(ii) non-inflammability
(iii) non-toxicity

(i), (ii) and (iii)
(i) only
(i) and (iii) only
(i) and (ii) only

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A single phase motor connected to 400 V, 50 Hz supply takes 30 A at a power factor of 0.7 lagging. Calculate the capacitance required in parallel with the motor to raise the power factor to 0.9 lagging.

79.5 μF
69.5 μF
89.5 μF
99.5 μF