Tank - Name of power station - capacity 1 - Vindhyachal Thermal Power Station - 4,760MW. 2 - Mundra Thermal Power Station - 4620 MW 3 - The Sasan Ultra Mega power plant - 3960 MW 4 - The Tiroda thermal power plant - 3300 MW
In FDLF method, B' corresponds to susceptance of unknown of PQ and PV bus Order of B' matrix is = (n -1)*(n - 1) Where n is total no. of buses. Order of B'' = (n - m - 1)*(n - m - 1)
Bus Type - Known Parameter - Unknown Parameter Load Bus -P, Q - V, phase angle Generator Bus - P, V (magnitude) - Q, Voltage phase angle Slack Bus Voltage - magnitude and phase angle - P, Q