In underground cables, the electrostatic stress is ___ at contactor surface and ___ at the sheath.

minimum, maximum
zero, zero
minimum, maximum
zero, minimum

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
In a single phase energy meter, the series electromagnet is energized by a ___ of ___

current coil, thick wire of few turns
voltage coil, thin wire of more turns
voltage coil, thick wire of few turns
current coil, thin wire of more turns

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
The expression for voltage regulation of a short transmission line for lagging power factor is given by: ___, where, 'I' is the line current, 'V_r' is the receiving end voltage, 'R' is the line resistance and 'X' is the line reactance.

(IX cosφ_r + IR sinφ_r)/V_r
(IR cosφ_r - IX sinφ_r)/V_r
(IR cosφ_r + IX sinφ_r)/V_r
(IX cosφ_r - IR sinφ_r)/V_r

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A balanced delta connected load of 8+j6 Ω per phase is connected to a 415 V, 50 Hz, 3-phase supply lines. If the input power factor is improved to 0.9 by connecting a star connected capacitor bank, then the required kVAR of the bank is

10.98 kVAR
8.98 kVAR
16.98 kVAR