MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Mundra Thermal Power Station
Vindhyachal Thermal Power Station
Talcher Super Thermal Power Station
Sasan Ultra Mega Power Plant

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
In underground cables, the electrostatic stress is ___ at contactor surface and ___ at the sheath.

zero, minimum
minimum, maximum
zero, zero
minimum, maximum

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A single phase motor connected to 400 V, 50 Hz supply takes 30 A at a power factor of 0.7 lagging. Calculate the capacitance required in parallel with the motor to raise the power factor to 0.9 lagging.

89.5 μF
69.5 μF
99.5 μF
79.5 μF