MGVCL Exam Paper (30-07-2021 Shift 1)
A grid interactive solar system:

supplies power to as well as receives power from the grid as required
always receives power from the grid
works only when the grid fails
always supplies power to the grid

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
In underground cables, the electrostatic stress is ___ at contactor surface and ___ at the sheath.

minimum, maximum
zero, minimum
zero, zero
minimum, maximum

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
___ is the rms value of the total current comprising the AC and DC components of the current in the circuit breaker pole at the instant of contact separation.

Asymmetrical breaking current
Symmetrical short circuit current
Symmetrical breaking current
Making current

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP