MGVCL Exam Paper (30-07-2021 Shift 1)
In the following question, one part of the sentence may have an error. Find out which part of the sentence has an error and select the option corresponding to it. If the sentence contains no error, Select "No error'' option. (Avoid punctuation errors)
(A) Bubin together with / (B) her parents are coming / (C) to attend the party. / (D) NO ERROR
The magnitude of earth fault current for a given fault position within a winding demands upon the winding connections and method of neutral grounding. Earth fault protection for an electric motor is provide by instantaneous relay having a setting of approximately 30% of motor rated current in the residual circuits of two CTs and with ground wire.
The ratio of full load current to short circuit current = 1/5 Xsc = j/(1/5) External reactance required = j*((1/5) - 0.05)) = j*0.15 pu Full load current = (30*1000)/(√3*11) = 1574.6 A Per unit reactance = j*0.15 = (I*Xr)/V j*0.15 = (1574.6*Xb)/((11/√3)*1000)) = 0.60 ohm