MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Mundra Thermal Power Station
Talcher Super Thermal Power Station
Vindhyachal Thermal Power Station
Sasan Ultra Mega Power Plant

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A balanced delta connected load of 8+j6 Ω per phase is connected to a 415 V, 50 Hz, 3-phase supply lines. If the input power factor is improved to 0.9 by connecting a star connected capacitor bank, then the required kVAR of the bank is

10.98 kVAR
16.98 kVAR
8.98 kVAR
14.98 kVAR