MGVCL Exam Paper (30-07-2021 Shift 1)
Determine maximum permissible load which a 15 MVA, ONAN cooled transformer to IS : 2026 can take for 6 hr, if the initial load on it was 12 MVA. The weighted ambient temperature is 20˚C. Assume the permissible load kVA as a fraction of rated kVA is 1.25.

12 MVA
9.6 MVA
15 MVA
18.75 MVA

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A grid interactive solar system:

always supplies power to the grid
works only when the grid fails
always receives power from the grid
supplies power to as well as receives power from the grid as required

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Sasan Ultra Mega Power Plant
Vindhyachal Thermal Power Station
Mundra Thermal Power Station
Talcher Super Thermal Power Station

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A coil having an inductance of 100 mH is magnetically coupled to another coil having an inductance of 900 mH. The coefficient of coupling between the coils is 0.45. Calculate the equivalent inductance if the two coils are connected in series aiding.

932 mH
1135 mH
1270 mH
730 mH

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
A THHN conductor will have 75°C termination on one end and a 60/75°C termination on the other, which ampacity column will be used?

None of these
90°C column
60°C column
75°C column