Waste Water Engineering The detention time (t) of a settling tank, may be defined as the time required for A particle to travel from top surface to bottom sludge zone A particle to travel along its length The flow of sewage to fill the tank None of these A particle to travel from top surface to bottom sludge zone A particle to travel along its length The flow of sewage to fill the tank None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Which one of the following tests is used for testing sewer pipes? Mirror test Water test All of these Ball test Mirror test Water test All of these Ball test ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Aerobic activity is maximum In freshly produced sewage At sewer pipes In sewer treatment plants None of these In freshly produced sewage At sewer pipes In sewer treatment plants None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During preliminary treatment of a sewage Oil and grease are removed from skimming tanks All listed here Girt and sand are removed by girt chambers Floating materials are removed by screening Oil and grease are removed from skimming tanks All listed here Girt and sand are removed by girt chambers Floating materials are removed by screening ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Boussinesq’s equation for ascertaining unit pressure at a depth on sewers due to traffic loads, is pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 ANSWER DOWNLOAD EXAMIANS APP