Waste Water Engineering The moisture content of sludge is reduced from 90% to 80% in a sludge digestion tank. The percentage decrease in the volume of sludge, is 0.25 0.5 0.1 0.05 0.25 0.5 0.1 0.05 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 1 3 to 5 5 to 10 2 to 3 1 3 to 5 5 to 10 2 to 3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering At the junction of sewers Top of smaller sewer is kept lower Tops of both the sewers are at the same level None of these Top of larger sewer is kept lower Top of smaller sewer is kept lower Tops of both the sewers are at the same level None of these Top of larger sewer is kept lower ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most effective arrangement for diverting excess storm water into a natural drainage, is None of these Overflow weir Siphon spill way Leaping weir None of these Overflow weir Siphon spill way Leaping weir ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Imhoff cone is used to determine Settleable solids Suspended solids None of these Dissolved solids Settleable solids Suspended solids None of these Dissolved solids ANSWER DOWNLOAD EXAMIANS APP