Irrigation Engineering The top of the capillary zone None of these Lies below the water table at every point Lies above the water table at every point Coincides the water table at every point None of these Lies below the water table at every point Lies above the water table at every point Coincides the water table at every point ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Unit of runoff in M.K.S. system is metre/sec square metre cubic metre cubic metre/sec metre/sec square metre cubic metre cubic metre/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The minimum size of stone that will remain at rest in a channel of longitudinal slope S and hydraulic mean depth R is given by 4RS 7RS 15 RS 11RS 4RS 7RS 15 RS 11RS ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Silt excluders are constructed on the canal bed downstream of head regulator river bed upstream of head regulator canal bed upstream of head regulator river bed downstream of head regulator canal bed downstream of head regulator river bed upstream of head regulator canal bed upstream of head regulator river bed downstream of head regulator ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In a syphon aqueduct Canal passes over the drainage and H.F.L. of the drainage is above the bottom of the canal trough Canal passes over the drainage and H.F.L. of the drainage is below the bottom of the canal trough Drainage passes over the canal and F.S.L. of the canal is above the bottom of the drainage trough Drainage passes over the canal and F.S.L. of the canal is below the bottom of the drainage trough Canal passes over the drainage and H.F.L. of the drainage is above the bottom of the canal trough Canal passes over the drainage and H.F.L. of the drainage is below the bottom of the canal trough Drainage passes over the canal and F.S.L. of the canal is above the bottom of the drainage trough Drainage passes over the canal and F.S.L. of the canal is below the bottom of the drainage trough ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The total capacity of a reservoir is 25 million cubic metres and dead storage is 5 million cubic metres. If the average volume of sediment deposition is 0.10 million cubic metre per year, then the usefulness of the reservoir will start reducing after 50 years 150 years 200 years 250 years 50 years 150 years 200 years 250 years ANSWER DOWNLOAD EXAMIANS APP