Irrigation Engineering Process of meandering is due to Relative erodibility of the bed and banks Discharge and hydraulic properties of streams Sediment load of streams All listed here Relative erodibility of the bed and banks Discharge and hydraulic properties of streams Sediment load of streams All listed here ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The most suitable location of a canal head work, is Boulders stage of the river Trough stage of the river Delta stage of the river Rock stage of the river Boulders stage of the river Trough stage of the river Delta stage of the river Rock stage of the river ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The relation between probability (P) and recurrence interval (T) is given by PT2 = 1 P/T2 = 1 P/T = 1 PT = 1 PT2 = 1 P/T2 = 1 P/T = 1 PT = 1 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Hydrodynamic pressure due to earthquake acts at a height of 4H/3π above the base 4H/3π below the water surface, where H is the depth of water 3H/4π above the base 3H/4π below the water surface 4H/3π above the base 4H/3π below the water surface, where H is the depth of water 3H/4π above the base 3H/4π below the water surface ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If d1 is the depth of cutting, d2 is the height of the bank from bed level r2 : 1 and r1 : 1 are the slopes in filling and cutting respectively, the horizontal distance n between the bed and bank, is x = d2 / r2 x = d1 / r1 x = r2 d2 x = r1 d1 x = d2 / r2 x = d1 / r1 x = r2 d2 x = r1 d1 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The downstream expansion head of a guide bank is extended to subtend an angle at the centre, equal to 60° 90° 30° 45° 60° 90° 30° 45° ANSWER DOWNLOAD EXAMIANS APP