Irrigation Engineering The water utilizable by plants is available in soils mainly in the form of gravity water chemical water hydroscopic water capillary water gravity water chemical water hydroscopic water capillary water ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The difference in level between the top of a bank and supply level in a canal, is called Height of bank Berm None of these Free board Height of bank Berm None of these Free board ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The flow of water after spilling over the weir crest in chute spillway and side channel spillway respectively are Parallel to weir crest in both Parallel and at right angle to weir crest At right angle to weir crest in both At right angle and parallel to weir crest Parallel to weir crest in both Parallel and at right angle to weir crest At right angle to weir crest in both At right angle and parallel to weir crest ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For wave action in dams, the maximum height of freeboard is generally taken to be equal to (where hw is height of wave.) 1.25 hw 1.50 hw 0.5 hw 0.75 hw 1.25 hw 1.50 hw 0.5 hw 0.75 hw ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Unit of runoff in M.K.S. system is square metre metre/sec cubic metre/sec cubic metre square metre metre/sec cubic metre/sec cubic metre ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The scour depth D of a river during flood, may be calculated from the Lacey's equation D = 0.47 (Q/f) D = 0.47 (Q/f)2/3 D = 0.47 (Q/f)1/2 D = 0.47 (Q/f)1/3 D = 0.47 (Q/f) D = 0.47 (Q/f)2/3 D = 0.47 (Q/f)1/2 D = 0.47 (Q/f)1/3 ANSWER DOWNLOAD EXAMIANS APP