Irrigation Engineering The uplift pressure on the face of a drainage gallery in a dam is taken as None of these average of hydrostatic pressure at toe and heel two-third of hydrostatic pressure at toe plus one-third of hydrostatic pressure at heel hydrostatic pressure at toe None of these average of hydrostatic pressure at toe and heel two-third of hydrostatic pressure at toe plus one-third of hydrostatic pressure at heel hydrostatic pressure at toe ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Regime conditions in a channel may occur if All listed here Discharge is constant Channel flows uniformly in incoherent alluvium as that transported in suspension Silt grade and silt charge are constant All listed here Discharge is constant Channel flows uniformly in incoherent alluvium as that transported in suspension Silt grade and silt charge are constant ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the correct statement from the following and answer In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing a regulator is provided across the drainage at its down-stream In a level crossing, a cross regulator is provided on the canal below the crossing All of these In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing a regulator is provided across the drainage at its down-stream In a level crossing, a cross regulator is provided on the canal below the crossing All of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For designing the venturi head, Length of the throat should be 2.5 times the depth measured to F.S.L. in the main canal Minimum throat width should not be less than 60 cm All listed here Width of the throat should not be less than one-third of the bed width of main canal Length of the throat should be 2.5 times the depth measured to F.S.L. in the main canal Minimum throat width should not be less than 60 cm All listed here Width of the throat should not be less than one-third of the bed width of main canal ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Seepage through foundation in an earthen dam is controlled by providing impervious cut off chimney drain rock toe horizontal blanket impervious cut off chimney drain rock toe horizontal blanket ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering F.S.L. of a canal at its head with respect to parent channel is kept At the same level None of these 15 cm lower 15 cm higher At the same level None of these 15 cm lower 15 cm higher ANSWER DOWNLOAD EXAMIANS APP