Irrigation Engineering
The uplift pressure on the face of a drainage gallery in a dam is taken as

hydrostatic pressure at toe
average of hydrostatic pressure at toe and heel
two-third of hydrostatic pressure at toe plus one-third of hydrostatic pressure at heel
None of these

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
Infiltration rate is always

equal to or less than the infiltration capacity
equal to or more than the infiltration capacity
more than the infiltration capacity
less than the infiltration capacity