Irrigation Engineering The uplift pressure on the face of a drainage gallery in a dam is taken as None of these hydrostatic pressure at toe average of hydrostatic pressure at toe and heel two-third of hydrostatic pressure at toe plus one-third of hydrostatic pressure at heel None of these hydrostatic pressure at toe average of hydrostatic pressure at toe and heel two-third of hydrostatic pressure at toe plus one-third of hydrostatic pressure at heel ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If V₀ is the critical velocity of a channel, its silt transporting power, according to Kennedy, is proportional to V₀3/2 V₀1/2 V₀7/2 V₀5/2 V₀3/2 V₀1/2 V₀7/2 V₀5/2 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering S-hydrograph is used to obtain unit hydrograph of shorter duration from longer duration both (A) and (B) None of these longer duration from shorter duration shorter duration from longer duration both (A) and (B) None of these longer duration from shorter duration ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For standing crops in undulating sandy fields, the best method of irrigation, is Check method Furrow method Free flooding Sprinkler irrigation Check method Furrow method Free flooding Sprinkler irrigation ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Silt excluders are constructed on the canal bed downstream of head regulator canal bed upstream of head regulator river bed upstream of head regulator river bed downstream of head regulator canal bed downstream of head regulator canal bed upstream of head regulator river bed upstream of head regulator river bed downstream of head regulator ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The peak of a 4 hour flood hydrograph is 240 m3/sec . If the rainfall excess is 80 mm and base flow which is constant is 40 m3/sec, then the peak of 4-hours unit hydrograph will be 30 m3/sec 25 m3/sec 35 m3/sec 20 m3/sec 30 m3/sec 25 m3/sec 35 m3/sec 20 m3/sec ANSWER DOWNLOAD EXAMIANS APP