Irrigation Engineering The intensity of irrigation means Percentage of gross commanded area to be irrigated annually Total depth of water supplied by the number of waterings Percentage of the mean of culturable commanded area and the gross commanded area to be irrigated annually Percentage of culturable commanded area to be irrigated annually Percentage of gross commanded area to be irrigated annually Total depth of water supplied by the number of waterings Percentage of the mean of culturable commanded area and the gross commanded area to be irrigated annually Percentage of culturable commanded area to be irrigated annually ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the correct statement from the following and answer All of these In a level crossing, a cross regulator is provided on the canal below the crossing In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing a regulator is provided across the drainage at its down-stream All of these In a level crossing, a cross regulator is provided on the canal below the crossing In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing a regulator is provided across the drainage at its down-stream ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The difference in level between the top of a bank and supply level in a canal, is called None of these Berm Height of bank Free board None of these Berm Height of bank Free board ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If V₀ is the critical velocity of a channel, its silt transporting power, according to Kennedy, is proportional to V₀7/2 V₀1/2 V₀3/2 V₀5/2 V₀7/2 V₀1/2 V₀3/2 V₀5/2 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Hydrograph is the graphical representation of ground waterflow and time surface runoff and time runoff and time rainfall and time ground waterflow and time surface runoff and time runoff and time rainfall and time ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The uplift pressure on the face of a drainage gallery in a dam is taken as None of these hydrostatic pressure at toe average of hydrostatic pressure at toe and heel two-third of hydrostatic pressure at toe plus one-third of hydrostatic pressure at heel None of these hydrostatic pressure at toe average of hydrostatic pressure at toe and heel two-third of hydrostatic pressure at toe plus one-third of hydrostatic pressure at heel ANSWER DOWNLOAD EXAMIANS APP