Irrigation Engineering When a canal and a drainage approach each other at the same level, the structure so provided, is A level crossing An aqueduct Inlet and outlet A syphon A level crossing An aqueduct Inlet and outlet A syphon ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The ratio of the average load to the installed capacity of the plant whose reserve capacity is zero will be equal to Utilization factor Both load and plant factor Plant factor Load factor Utilization factor Both load and plant factor Plant factor Load factor ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The ratio of the quantity of water stored in the root zone of the crops to the quantity of water actually delivered in the field is known as water conveyance efficiency None of these water application efficiency water use efficiency water conveyance efficiency None of these water application efficiency water use efficiency ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering When the reservoir is full, the maximum compressive force in a gravity dam is produced at centre of base within the middle third of base at the toe at the heel at centre of base within the middle third of base at the toe at the heel ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The total capacity of a reservoir is 25 million cubic metres and dead storage is 5 million cubic metres. If the average volume of sediment deposition is 0.10 million cubic metre per year, then the usefulness of the reservoir will start reducing after 150 years 250 years 50 years 200 years 150 years 250 years 50 years 200 years ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The main cause of meandering is the extra turbulence generated by the excess of river sediment during floods None of these degradation presence of an excessive bed slope in the river the extra turbulence generated by the excess of river sediment during floods None of these degradation presence of an excessive bed slope in the river ANSWER DOWNLOAD EXAMIANS APP